Resource Items Tab

Updated over 2 weeks ago

Although you are able to add Individual Payment Stages, Estimating Sections and Packages to the Standard Template Workbench, the best way to be able to handle the template items is through the Resource Items tab.

Resource Items Tab

Adding Resources

To add a resource, ensure that the ‘add type’ on the workbench is set to ‘Resource Line’.

Click Add, you’ll be taken to a screen where you’ll be able to add a new resource.

There are four main parts to the adding of a resource to the template item tab. These are ‘Item Selection’, ‘Pricing Details’, ‘Other Details’ and ‘Ordering Details’.

Item Selection

Field

Description

Resource Code

The unique code which identifies this resource item.

Variant

The template variant this resource is used on, if relevant.

Description

The description of the resource.

Template Dependent

Whether this resource is house-type dependent.

Substitute

Whether this resource should be substituted before raising an order.

Estimating Section

The estimating section to which this resource belongs.

Cost Head

Enter the cost head code or number.

Payment Stage

The sequence number of the payment stage.

Quantity

The quantity of this resource.

Unlabelled field

The unit of measure for the quantity.

DIM Sheet

Whether to use a dimension sheet to build up the quantity for this item.

Size

The size that the resource comes in.

Unlabelled field

The unit of measure for the size.

Wastage

The wastage percentage for materials.

Unlabelled field

The gross quantity (that is, the net quantity with the materials wastage percentage applied to it)

Pricing Details

It is worth noting that within the Pricing Details you MUST ensure that the ‘status’ is set to ‘Not Applicable’ against the categories that aren’t being used and also ensure that the ‘item ready to use’ tick box is not ticked.

Other Details

Other Details is more memo data rather than specifically affecting anything to do with the resource and usage of it.

Ordering Details

It is important to ensure that the ordering details is filled out and that a resource is associated to either a material or subcontract package, this allows you to view the resources against the individual lots within the surveyor workbenches, this must be associated

Once you are happy with your resource you can click Save (Save Icon), once it is saved, the screen will blank out all of the details you have just entered, this is so that you can add a new resource without navigating away. To navigate away from this click Undo () at the bottom right hand side of the screen. You will eventually have a screen that looks like this;

This in total is what makes up your template, all resources should now be part of this screen.

Once you add items to the template items tab, the workbench automatically groups the details against all other tabs based on the resources existing in this workbench. For example:

By adding this resource, it populates the information automatically against all applicable tabs minus the variants and intelligent resources. This can be seen below;

Payment Stages

Estimating Sections

Package Browse