Assigning SC Orders
Subcontract orders must first be assigned to a main contractor user before they can be enhanced. This is done from the All SC Orders grid, which contains a list of every subcontract order which has been sent through from COINS ERP+. This grid is accessible from the SC Orders screen, by selecting All Orders from the Show drop-down menu.
It is also possible to set a default assignee for all SC orders related to a specific contract (see Default Assignee for a Contract).
Assigning an Individual SC Order
Right-click the subcontract order you wish to assign or left-click the order and click the menu icon
. To assign the order to yourself, click Assign To Me. To assign the order to someone else, click Assign To. This opens the Assign To window.Select the desired assignee from the drop-down list.
Click
to save the assignment.
Assigning SC Orders by Contract
Assign by Contract allows you to quickly assign to one user every subcontract order linked to a specific contract.
Right-click a subcontract order, or left-click an order and click the menu icon
, then click Assign by Contract. This opens the Assign by Contract window.Select the contract linked to the subcontract orders you wish to assign from the drop-down list.
Select the desired assignee from the drop-down list.
Click
to save the assignment.
Delegating an SC Order
Delegation allows you to set a new temporary owner of a subcontract order which has already been assigned.
Right-click the subcontract order you wish to delegate, or left-click the order and click the menu icon
, then click Delegate To. This opens the Delegate To window.Select the desired assignee from the drop-down list.
Click
to save the delegation.
Clearing Assignment of an SC Order
Right-click the subcontract order you wish to clear, or left-click the order and click the menu icon
, then click Clear Assignment. The assignee will be removed from the order.
Enhancing SC Orders
Before a subcontract order can be shared with a subcontractor user, it must first be enhanced by the main contractor user to whom it has been assigned. Enhancement of a subcontract order involves three steps: selecting the contract form type, setting the order rules and setting the valuation dates.
The order lines for breakdown orders are not viewable in the enhancement stage. The order lines can be viewed when creating a payment or pay less notice, or when reviewing an application.
Open SC Orders and select My Orders from the Show drop-down menu. This shows a list of every subcontract order which has been assigned to you.
Right-click subcontract order you wish to enhance, or left-click the order and click the menu icon
, then click Enhance. This opens the Enhance Order window.Select the contract form type from the Contract Form drop-down list.
If you have the user role "MC Allow Early App", the Allow Early Application tick box will be available. If you tick this box, the subcontractor will be able to submit an application for this order before the first published valuation period.
Select whether to use the default order rules or override them. See Order Rules for more details.
Set the valuation dates for the order. See Valuation Dates for more details.
Click
to share the order with the subcontractor. If you do not wish to share the order yet, click
to save the enhanced or
Order Rules
📌Note: Setting order rules is one step in the process of enhancing and sharing an order. For an overview of the full process, see Enhancing SC Orders.
If you wish to use the default rules, tick the Use Default Rules tick box. If you wish to set custom rules for this order, untick the box and click the
button. This opens the Override Default Rules window.
📌Note: If you have the user role MC Limited QS, you cannot override the default order rules. The tick box will be locked and the button greyed out.
The rules available to set vary according to region. The numbers all refer to calendar days, not working days.
UK
For the Application Due Date, Payment Due Date, Payment Notice Due Date and Final Payment Date, you must enter a value between -90 and 90. This value relates to the number of days away from the Valuation Date. For example, in the image above, the Application Due Date is set to -1 and the Payment Due Date is set to 10. This means the deadline for the subcontractor to submit an application for payment is one day before the Valuation Date and the deadline for the main contractor tenant to submit the payment is ten days after the Valuation Date.
For the Last date to send a Pay Less Notice, you must enter a value between -90 and -1. This value relates to the number of days away from the Final Payment Date. For example, in the above image the Final Payment Date is set to 30 and the Last date to send a Pay Less Notice is set to -5. This means the deadline for the main contractor tenant to submit a Pay Less Notice is five days before the Final Payment date, or twenty-five days after the Valuation Date.
When you are satisfied with the rules you have set, click
to save your changes.
Australia
For the Claim Due Date, you must enter a value between -90 and 90. This value relates to the number of days away from the Valuation Date. For example, in the image above, the Claim Due Date is set to 14, meaning the deadline for the subcontractor to submit a claim is 14 days after the Valuation Date.
For the Payment Schedule Due Date and the Final Date for payment, you must enter a number between 0 and 90. This value relates to the number of days away from the Claim Received Date. You cannot enter a higher value for the Payment Schedule Due Date than you did for the Claim Due Date.
For the Tax Invoice Received by Date, you must enter a value between -90 and 90. This value relates to the number of days away from the Claim Received Date. This is for non-RCTI subcontractors only - the field will be hidden if the order is for an RCTI subcontractor.
When you are satisfied with the rules you have set, click
to save your changes.
Valuation Dates
📌Note: Setting valuation dates is one step in the process of enhancing and sharing an order. For an overview of the full process, see Enhancing SC Orders.
If the contract linked to this subcontract order has had valuation dates set, these dates will be automatically filled in when you open the Enhance Order window. You can still add, edit and remove valuation dates if you wish.
Valuation dates can be added individually or in bulk by setting up a recurrence pattern.
Adding an Individual Valuation Date
Right-click somewhere on the Valuation Dates table, then click Add New. This opens the Add New Valuation Date window.
Enter the valuation date. You can use the calendar lookup, enter the date manually or use standard COINS shorthand, for example "+1w3d" meaning one week and three days in the future. You cannot add valuation dates which are configured as bank holidays in SC Controller; attempting to do so will return a red warning symbol.
Click
to add the valuation date to the order.
Setting Up a Recurrence Pattern
Click
. This opens the Recurrence Pattern window.Configure the window as required. Click
to view the list of valuation dates that will be set based on the criteria you have entered.Click
to add the valuation dates to the order.
Modifying a Valuation Date
Right-click the valuation date you wish to modify, or left-click the date and click the menu icon
, then click Modify.Enter the new date.
Click
to save your changes.
Deleting a Valuation Date
Right-click the valuation date you wish to modify, or left-click the date and click the menu icon
, then click Delete. You will receive a warning message asking if you are sure.Click
to confirm the deletion.
Amending Offsets
If you have the ‘Offset Admin’ user role, you will have access to the Amend Offsets functionality. This allows you to change the offsets of an SC order after it has been enhanced and shared with the subcontractor.
To begin amending offsets, open All SC Orders, then click the Amend Offsets button at the top of the screen.
This opens the Select SC Orders to amend offsets screen.
This screen contains the full list of SC orders whose offsets can be amended.
To be amendable, an SC order must not have a status of 'New, 'Cancelled' or 'Closed'.
If an order already has applications and notices against it from past valuation dates, you can still amend offsets for a future valuation date for that order if the following conditions are met:
The valuation date occurs after the present day.
The valuation date is not the only valuation date after the present day.
The valuation date does not have any applications or notices against it (of any status).
To select an order to amend, tick the box to the left of its order number. You can select as many orders as you wish. To select all orders, tick the box to the left of the SC Order Number column heading. Once you have selected all the orders you wish to amend, click
in the bottom-right of the screen to open the Amend Offsets window. Only future valuation dates with amendable offsets are shown.Enter the new offsets in the Amended Offsets to apply section.
Optionally enter a reason for the amendment in the Reason text box.
To preview the new dates for each period of an order based on the new offsets you have entered, first select the contract and order you wish to preview from the drop-down lists, then click
. The dates will appear in the table at the bottom of the window.Once you are done, click
to save your changes. If successful, you will receive a popup message confirming that the offsets have been changed. The relevant subcontractor users will also be notified that existing valuation dates have been modified.
Audit Trails
Audit trails are available for SC orders (once they have been enhanced and shared) and payment and pay less notices.
SC Order Audit
The audit trail for an SC order contains a record of when the order was first shared, as well as each time the offsets for that order were changed. To view the audit trail for an SC order, right-click the order in My SC Orders, or left-click the order and click the menu icon
, then click View Audit.
Use the ‘Show items for’ drop-down to select how far back you wish to view. The list of changes is displayed on the left-hand side of the window with date and time stamps. Click one of the changes to view the details of that change on the right side of the window. The details include the old and new values of any offsets that were changed, as well as any comments that were left by the user who made the change.
Notice Audit
The audit trail for a payment or pay less notice contains records of when and by whom the notice was created, shared and last updated. It also includes a Workflow table which records each time the notice changes workflow status, including every approval and rejection, every time it becomes overdue for approval, every assignment change and every ERP+ action.
If there is an icon in the Notes column of the Workflow table, you can hover over it to view a tooltip containing additional information. If it is an approval or rejection, the tooltip will contain the approver's notes or rejection reason. If it is an overdue notification, the tooltip will contain the approver(s) responsible for that stage of approval. If it is an assignment change, the tooltip will contain the reason for the change of assignment. If it is a "Rejected by ERP+" record, the tooltip will contain the error message sent from ERP+.
Viewing Compliance for an SC Order
Open All SC Orders or My SC Orders and find the order for which you wish to view the compliance.
Right-click the order, or left-click the order and click the menu icon
, then click View. This opens the View Order Details screen.Scroll down to the table at the bottom of the window. In the Application Due, Payment Notice Due and Pay Less Notice Due columns, you can view the due date and the actual date the application or notice was submitted for each period. The compliance for each period can be viewed in the right-most column. The compliance percentage indicates how many of the required documents (application, payment, pay less) were submitted on time. It increases by 33% (rounded down) for each document submitted before the due date. For example, for the 31/07/2018 valuation date in the above image, only the payment notice was submitted on time, so the compliance for that period is 33%.
Viewing Applications for Payment
Once a subcontractor user has submitted an application for payment, it will become visible to the main contractor users of the company who shared the order. There are three ways in which a main contractor user can view applications:
To view the application related to a specific payment notice or pay less notice, open Notices. Right-click the notice you wish to view the application for, or left-click the notice and click the menu icon
, then click View Related Application.To view the list of applications that have been submitted against a specific order, open My SC Orders. Right-click the order you wish to view applications for, or left-click the order and click the menu icon
, then click View Applications.To view the list of all applications that have been submitted to your company, open the Applications screen.
To view an application, right-click the application you wish to view, or left-click the application and click the menu icon
, then click View Application. This opens the View Application screen.
If there are files attached to the application, you can download these by clicking the Attachments tab, then clicking the file names.
Creating Notices
Creating a Payment Notice
This topic covers the standard payment notice format. For breakdown order payment notices, see Creating a Payment Notice for a Breakdown Order.
A payment notice can be created and submitted if the following conditions are met:
At least one open window is available.
No payment notice already exists in the period or any later periods.
No pay less notice with status 'Issued' or 'Submitted' exists in the period or any later periods.
No notices with status 'Awaiting WF Approval', 'Awaiting DELAPS Approval' or 'Awaiting SQS Approval' exist in any period, before or after. In this case, it is possible to save but not submit the payment notice.
To begin creating a payment notice, either:
Open My SC Orders. Right-click the order you wish to create a payment notice for, or left-click the order and click the menu icon
, then click Create Payment Notice. This creates a payment notice for the earliest period with an open window and without a payment notice or outstanding pay less notice in it.Or
Open Applications. Right-click the application you wish to create a payment notice for, or left-click the application and click the menu icon
, then click Review Application.
If an application exists within the period you are creating a notice for, the Create Payment Notice screen will be populated with values from that application. If an application exists for a later period, it will not be populated with values from that application.
📌Note: The field labels for the first two steps below are customisable by the main contractor in Certificate Definition Maintenance, so they may appear differently than in the above image.
The process for completing the fields and the underlying calculations remain the same regardless of the field labels.
Enter values for the Recharge and Costed Amount in the MC Valuation To Date column. If the subcontractor has applied for payment for this order, the total amount applied for will be shown in the SC Applied To Date column.
The Discount and Retention values will be calculated automatically, but you can still edit them if you wish.
The Cost of Materials (This App) field in the This Period column may or may not be editable, based on the CIS status of the subcontract. If it is editable, you must enter a value for this period. You cannot enter a negative value or a value greater than the sub total for this period. The Labour Liable for Tax value will be calculated automatically.
To customise the VAT distribution, click
.Click the circle next to ‘Multi – Line VAT’ to enable multi-line VAT. You must then enter the relevant amounts for each VAT code. The total of the amounts you have entered is displayed at the bottom of the window and it must be equal to the Total to Distribute displayed at the top for the distribution to be valid. Click
to save the distribution.You must attach at least one non-internal file as backup to the notice before it can be submitted. To attach a file:
Click the Browse button at the bottom of the screen to open your local directory.
Find the file you wish to upload, then double click it or drag and drop it to the Create Payment Notice window.
If you wish to mark the file as internal, tick the Internal Only tick box. This will prevent the subcontractor from being able to see the file when they view the payment notice after submission. Internal files are marked by a tick in the Internal Only column of the Attachments grid.
Click
to upload the file.
You can attach multiple files this way if you wish.
To view each of the files attached to the notice, open the Attachments tab at the top of the screen. If the subcontractor has applied for payment for this period on this order, you will also be able to see any files they attached to their application (such files will have "SC" in the Created By column).
To delete an attachment that you have uploaded, right-click it and click Delete File, then click
on the popup.Once you have attached a file, you can modify the costing if you wish. For details, see Costing Distribution.
Click
to save the payment notice. The notice will be added to the list on the Notices screen but will not be sent to the subcontractor and will be available to edit.Click
to submit the notice to the subcontractor, or to workflow if it exists.
Creating a Payment Notice for a Breakdown Order
Payment notices for breakdown orders differ slightly from regular orders. The same conditions for notice creation and submission still apply – see Creating a Payment Notice for details.
To begin creating a payment notice, either:
Open My SC Orders. Right-click the order you wish to create a payment notice for, or left-click the order and click the menu icon
, then click Create Payment Notice. This creates a payment notice for the earliest period with an open window and without a payment notice or outstanding pay less notice in it.Or
Open Applications. Right-click the application you wish to create a payment notice for, or left-click the application and click the menu icon
, then click Review Application.
For breakdown orders, the Payment Notice screen contains two tabs: Summary and Payment Notice. The Summary tab resembles the Details tab for regular payment notices – the main difference being that the measured works fields are read-only, and their values are calculated from the entries in the Payment Notice tab.
Open the Payment Notice tab to view each order item of the breakdown.
For each order line, enter a value in either the Qty To Date, the MC Valuation To Date or the % To Date column. Note that these are cumulative values, and some of these columns may not be available based on the order configuration. You cannot enter a value greater than the value of the order item (shown in the Order column). When you update one of these fields, the other two on the same line are updated automatically when you click elsewhere on the screen.
If there is at least one committed variation order, the Variations sub-tab will be available. Open it to view the variation orders.
Variation orders work in the same way as original order lines. Enter values in either the Qty To Date, the MC Valuation To Date or the % To Date column for each line.
You can add notes to an original order item or variation order by clicking the button in the Notes column on that line. Once an order item or variation order has notes attached, the Notes button on that line will turn yellow, and you can hover the button to read the notes in a tooltip.
Australia only: Open the Other Adjustments tab to view any additional adjustments which have been made to the original order by the subcontractor, and to create your own adjustments if necessary.
Return to the Summary tab to view the overall payment values. The Discount and Retention values are calculated automatically, but you can still edit them if you wish.
The Cost of Materials (This App) field in the This Period column may or may not be editable, based on the CIS status of the subcontract. If it is editable, you must enter a value for this period. You cannot enter a negative value or a value greater than the sub total for this period. The Labour Liable for Tax value will be calculated automatically.
To customise the VAT distribution, click
.Click the circle next to ‘Multi – Line VAT’ to enable multi-line VAT. You must then enter the relevant amounts for each VAT code. The total of the amounts you have entered is displayed at the bottom of the window and it must be equal to the Total to Distribute displayed at the top for the distribution to be valid. Click

to save the distribution.
Attachments are not mandatory for breakdown orders. If you wish to add an attachment anyway:
Click
to open the attachments screen.Click Browse to open your local directory.
Find the file you wish to upload, then double click it or drag and drop it to the Create Payment Notice window.
If you wish to mark the file as internal, tick the Internal Only tick box. This will prevent the subcontractor from being able to see the file when they view the payment notice after submission. Internal files are marked by a tick in the Internal Only column of the Attachments grid.
Click
to upload the file.
You can add multiple files this way if you wish.
You can view each of the files added to the notice in the table. If the subcontractor has applied for payment for this period on this order, you will also be able to see any files they attached to their application (marked by SC in the Created By column).
To delete an attachment that you have uploaded, right-click it and click Delete File, then click
on the popup.You can view the costing distribution if you wish. For details, see Costing Distribution.
Click
to save the payment notice. The notice will be added to the list on the Notices screen but will not be sent to the subcontractor and will be available to edit.Click
to submit the notice to the subcontractor, or to workflow if it exists.
Creating a Pay Less Notice
📌Note: This topic covers the standard pay less notice format. For breakdown order pay less notices, see Creating a Pay Less Notice for a Breakdown Order.
A pay less notice can be created and submitted if the following conditions are met:
It is on or before the valuation date of the period.
No payment or pay less notices with status "Issued", "Submitted" or "Awaiting Approval" exist in later periods.
No notices with status "Awaiting WF Approval", "Awaiting DELAPS Approval" or "Awaiting SQS Approval" exist in any period, before or after. In this case, it is possible to save but not submit the pay less notice.
No other payment or pay less notice exists for the same period, other than for the following exceptions:
The previous notice was rejected by DELAPS.
The previous notice was rejected by ERP+.
The previous notice was auto issued.
A pay less notice can be deleted only if its status is "New".
Open My SC Orders. Right-click the order you wish to create a pay less notice for, or left-click the order and click the menu icon
, then click Create Pay Less Notice.Select the valuation date for the period you wish to create the pay less notice for. An error message will notify you if you are past the last date to submit a pay less notice for that period. If this is the case, you will not be able to save or submit the notice.
📌Note: The field labels for the two steps below are customisable by the main contractor in Certificate Definition Maintenance, so they may appear differently than in the above image. The process for completing the fields and the underlying calculations remain the same regardless of the field labels.
Enter the gross value of the notice.
The Discount and Retention values will be calculated automatically, but you can still edit them if you wish.
The Cost of Materials (This Period) field may or may not be editable, based on the CIS status of the subcontract. If it is editable, you must enter a value for this period. You can enter a negative value, as long as the cumulative value does not go below 0.00. You cannot enter a value greater than the sub total for this period. The Labour Liable for Tax value will be calculated automatically.
Enter a reason for the pay less notice if you wish. This is for your internal records and will not be shared with the subcontractor.
To customise the VAT distribution, click
.Click the circle next to ‘Multi – Line VAT’ to enable multi-line VAT. You must then enter the relevant amounts for each VAT code. The total of the amounts you have entered is displayed at the bottom of the window and it must be equal to the Total to Distribute displayed at the top for the distribution to be valid. Click
to save the distribution.You must attach at least one non-internal file as backup to the notice before it can be submitted. To attach a file:
Click the Browse button at the bottom of the screen to open your local directory.
Find the file you wish to upload, then double click it or drag and drop it to the Create Pay Less Notice window.
If you wish to mark the file as internal, tick the Internal Only tick box. This will prevent the subcontractor from being able to see the file when they view the pay less notice after submission. Internal files are marked by a tick in the Internal Only column of the Attachments grid.
Click
to upload the file.
You can attach multiple files this way if you wish.
To view each of the files attached to the notice, open the Attachments tab at the top of the screen.
To delete an attachment that you have uploaded, right-click it and click Delete File, then click
on the popup.Once you have attached a file, you can modify the costing if you wish. For details, see Costing Distribution.
Click
to save the pay less notice. The notice will be added to the list on the Notices screen but will not be sent to the subcontractor and will be available to edit.Click
to submit the notice to the subcontractor.
Deleting a Pay Less Notice
Pay less notices can be deleted if their status is still "New". This is to prevent conflicts when several notices are created and then one is submitted. Pay less notices of any other status cannot be deleted.
On the Notices screen, right-click the pay less notice you wish to delete, or left-click the notice and click the menu icon
, then click Delete Pay Less Notice. You will receive a popup asking if you are sure.Click
to confirm the deletion.
Creating a Pay Less Notice for a Breakdown Order
Pay less notices for breakdown orders differ slightly from regular orders. The same conditions for notice creation, submission and deletion still apply – see Creating a Pay Less Notice for details.
Open My SC Orders. Right-click the order you wish to create a pay less notice for, or left-click the order and click the menu icon
, then click Create Pay Less Notice.For breakdown orders, the Pay Less Notice screen contains two tabs: Summary and Pay Less Notice. The Summary tab resembles the Details tab for regular pay less notices – the main difference being that the Gross Valuation field is read-only, and its value is calculated from the entries in the Pay Less Notice tab.
Open the Pay Less Notice tab to view each order item of the breakdown.
For each order line, enter a value in either the Qty To Date, the MC Valuation To Date or the % To Date column. Note that these are cumulative values, and some of these columns may not be available based on the order configuration. You cannot enter a value greater than the value of the order item (shown in the Order column). When you update one of these fields, the other two on the same line are updated automatically when you click elsewhere on the screen.
If there is at least one committed variation order, the Variations sub-tab will be available. Open it to view the variation orders.
Variation orders work in the same way as original order lines. Enter values in either the Qty To Date, the MC Valuation To Date or the % To Date column for each line.
You can add notes to an original order item or variation order by clicking the button in the Notes column on that line. Once an order item or variation order has notes attached, the Notes button on that line will turn yellow, and you can hover the button to read the notes in a tooltip.
Return to the Summary tab to view the Gross Valuation figure. The Discount and Retention values are calculated automatically, but you can still edit them if you wish.
The Cost of Materials (This Period) field may or may not be editable, based on the CIS status of the subcontract. If it is editable, you must enter a value for this period. You can enter a negative value, as long as the cumulative value does not go below 0.00. You cannot enter a value greater than the sub total for this period. The Labour Liable for Tax value will be calculated automatically.
Enter a reason for the pay less notice if you wish. This is for your internal records and will not be shared with the subcontractor.
To customise the VAT distribution, click
.Click the circle next to ‘Multi – Line VAT’ to enable multi-line VAT. You must then enter the relevant amounts for each VAT code. The total of the amounts you have entered is displayed at the bottom of the window and it must be equal to the Total to Distribute displayed at the top for the distribution to be valid. Click
to save the distribution.Attachments are not mandatory for breakdown orders. If you wish to add an attachment anyway:
Click
to open the attachments screen.Click Browse to open your local directory.
Find the file you wish to upload, then double click it or drag and drop it to the Create Pay Less Notice window.
If you wish to mark the file as internal, tick the Internal Only tick box. This will prevent the subcontractor from being able to see the file when they view the pay less notice after submission. Internal files are marked by a tick in the Internal Only column of the Attachments grid.
Click
to upload the file.
You can add multiple files this way if you wish. You can view each of the files added to the notice in the table.
To delete an attachment that you have uploaded, right-click it and click Delete File, then click
on the popup.You can view the costing distribution if you wish. For details, see Costing Distribution.
Click
to save the pay less notice. The notice will be added to the list on the Notices screen but will not be sent to the subcontractor and will be available to edit.Click
to submit the notice to the subcontractor, or to workflow if it exists.
Costing Distribution
Once you have attached a file to a payment notice or pay less notice, if you have the MC Analysis or MC Analysis Manual user roles, you can modify the costing if you wish. To do this, click the
button. This opens the Costing Distribution screen.
📌Note: This functionality is available for lump sum notices only. For breakdown notices, costing distribution is calculated automatically and cannot be edited by the user, except for costing lines which are not attached to a PO item (as is the case for non-recoverable VAT in the UK and other adjustments and non-recoverable GST in Australia).
This screen is pre-filled with a number of costing lines (defined when the SC order was created in COINS ERP+). You can add, modify and delete costing lines on this screen. The total amount you need to distribute is displayed in the top-left of the screen and the sum of the lines you have added is displayed in the top-right. The Distributed Amount must be equal to the Amount to Distribute for the costing distribution to be valid (if there is a discrepancy, the
button will be disabled). To prevent errors, PO lines with a blank analysis are excluded from the costing distribution.
If you have the MC Analysis user role, the total amount you input to the notice is automatically distributed against each costing line, starting with the first line and moving to the next one down once the O/S (outstanding) value is met, however you can still edit this distribution. If you have the MC Analysis Manual user role, the amount is not automatically distributed and you must manually distribute the amount against each line.
When you are done, click
to save the distribution.
Adding a Line Manually
Right-click somewhere in the grid, or left-click a line and click the menu icon
, then click Add line. This opens the Distribute Amount window.Select a PO Line from the drop-down list.
Select a cost code from the Analysis drop-down list. If you cannot find the relevant cost code:
Click
. This opens the Add custom analysis code window.Select the desired section, activity, cost head and default cost category from the drop-down lists.
Click
to load the new cost code from COINS ERP+. If successful, it will now be available to select from the Analysis field. Costing lines with a newly created cost head have a star in the CH column in the Costing Distribution grid.
Enter the amount you wish to assign to this costing line in the Amount field.
Enter the Cost Date. You can use the calendar lookup, enter the date manually or use standard COINS shorthand, for example +1w3d meaning one week and three days in the future.
Click
to save the line.
Modifying a Line
Right-click the line, or left-click the line and click the menu icon
, then click Modify line. This opens the Distribute Amount window for that line.Edit the fields as necessary.
Click
to save the line.
Deleting a Line
Right-click the line, or left-click the line and click the menu icon
, then click Delete line. You will receive a warning message asking if you are sure.Click
to confirm.
Uploading Lines via CSV
If you have the MC Analysis Load user role, you will have access to the CSV upload function. This provides a quick way to add a large number of costing lines to the costing distribution.
The first step is to save the costing lines in a CSV file. The CSV file should have the following data in each column:
Column | Data |
A | Analysis |
B | Description |
C | Amount |
D | Cost Date |
Click the
button. This opens the Load Costing Distribution window.Click the dark space to open File Explorer, then locate and open the CSV file. Alternatively, drag and drop the CSV file onto the Load Costing Distribution window. The data will then appear in a grid.
If the first row in the CSV file contains column headings, tick the “first row is title” tick box to ignore the first row of data.
If there are problems detected with the alignment of the data, click the
button and the system will attempt to match the labels in the CSV to the expected columns. Click the Reset button to undo Auto Align. If Auto Align does not work, you can manually align the columns using the drop-downs at the top of the grid.The default date format is YYYY/MM/DD. If the dates in the CSV are of a different format, select the correct one from the drop-down list below the Cost Date column heading.
Once you have the "no problems detected" message at the top of the screen, click the
button to import the CSV. If successful, you will receive a completion message.Click
to close the message and open the Analysis Load window. This is a validation step to ensure that the cost codes on each line either exist or can be created. If there are problems with any of the cost codes, they will be detailed in the Notes column of the grid. You cannot save the costing distribution unless every cost code is valid. To rectify invalid cost codes, you must go back into the CSV file and change them to valid cost codes, then reupload the CSV.Click
to complete the upload. The uploaded costing lines will then appear in grid on the Costing Distribution screen.
Notice Approval
Depending on how the contract workflows were set up, certain contracts may require notices above a certain value to undergo approval from workflow managers before they are submitted to the subcontractor. If you are set up as a workflow manager, you can find a list of notices awaiting your approval on the Approval Workbench screen or the Approval for Notices screen. If you are set up as a Senior QS user, you can also find notices pending approval on the SQS Approval for Notices screen.
If you hover your cursor over a value in the Awaiting Approval by Level column, you can view a tooltip containing the names of the approvers responsible for approving that notice (for the current stage of approval only).
Approving or Rejecting a Notice
Approving or Rejecting a Notice from the Notice Approval Grid
To quickly approve a notice, right-click the notice, or left-click the notice and click the menu icon
, then click Approve. The notice will then be removed from the list and sent either to the subcontractor or the next stage of approval.
To quickly reject a notice, right-click the notice, or left-click the notice and click the menu icon
, then click Reject. You will receive a popup in which you must enter a reason for the rejection.
Enter a reason in the box then click
. The notice will then be removed from the list and sent back to the main contractor who created it.
Reviewing a Notice
To view the full details of a notice, right-click the notice, or left-click the notice and click the menu icon
, then click View (DELAPS approval only).
The Notes field contains any notes left by the creator of the notice. If you wish to leave any notes of your own, enter them into the Approver Notes text box.
To attach a file to the notice, click the Browse button to open your local directory, then find and open the file. Alternatively, drag and drop the file onto the payment notice window. Finally, click
.
To view the list of files attached to the notice, open the Attachments tab.
In the Created By column, you can see which files were uploaded by the subcontractor (SC), which were uploaded by the creator of the notice (MC (Requester)) and which were uploaded by an approver (MC (Approver)). Files attached by approvers are marked Internal Only and are not shared with the subcontractor. To view an attachment, click its file name to begin downloading it.
When you are ready to approve or reject the notice, scroll to the bottom of the window.
To approve the notice, click
. The notice will then be removed from the list and sent either to the subcontractor or the next stage of approval.
To reject the notice, click
. You will receive a popup in which you must enter a reason for the rejection.
Enter a reason in the box then click
. The notice will then be removed from the list and sent back to the main contractor who created it.
Approval Delegation
If you are a workflow approver, you can delegate approval to another workflow approver for a set period. This can be useful if you will be unable to perform your duties as an approver for some time.
Once delegation is switched on, you will be unable to view or action workflow in your workbench until it is switched off, or the delegation period ends. The delegated user will gain access to all your existing approvals and any further approvals that would have been sent to you during the period of delegation, in addition to their own workflow.
When the delegation period ends, new approvals will start being sent to your workbench again, but all delegated workflow will remain with the delegated user. You can work around this by manually reassigning approvals to yourself using Another Users Workbench.
Click your username or avatar, then click the Preferences icon
.This opens the User Preferences window.
Click Delegation Options under SC Controller. This opens the Delegation Options screen.
Click
to reveal the delegation options.Enter dates in the From and To fields to specify the period of delegation. You can use the calendar lookup, type the dates manually, or use standard COINS shorthand, for example “$+2w” to mean “two weeks after today”.
Select the approver to whom you wish to delegate from the Approver drop-down list. Only approvers with the same contract security as you are available to select from the list.
Tick the Send Email Notification tick box if you wish for automated emails to be sent to both you and the delegated approver to confirm the delegation.
Click
to save your delegation.
Another Users Workbench
If you have the ‘MC Another User View’ user role, you can view the Approval Workbenches of other, lower-level approvers and assign notices awaiting their approval to yourself. Once you have assigned a notice to yourself, it will appear in your own Approval Workbench and you can approve or reject it as normal. This function is useful in situations where, for example, the only level one approver is sick or on holiday and did not turn on delegation, and there are notices in their workbench that require approval before they can return.
Click the > button next to Approval Workbench on the side menu, then click Another Users Workbench. This opens the Another Users Workbench screen.
Select the approver whose workbench you wish to view from the ‘Another user’ drop-down list. The selected user’s workbench will then appear in the grid below.
To assign a notice to yourself, right-click the notice, or left-click the notice and click the menu icon
, then click Assign to Me. The notice will then be removed from the other user’s workbench and appear in your own. Please note that this action is irreversible.Click the
button in the bottom-right of the screen to return to your own Approval Workbench grid. You can now approve or reject the notice as normal. See Approving or Rejecting a Notice for more information.
Tax Invoice Review
📌Note: The functionality covered below is available to users of Australian SC Controller only.
After you submit a payment schedule for a non-RCTI order, the subcontractor must attach a tax invoice and submit it back. Once the subcontractor has submitted a tax invoice, you will have the opportunity to review the invoice before the payment schedule is released for payment. You can mark it as Agreed, at which point the payment schedule will be issued and the certificate created in ERP+, or you can mark it as In Dispute, at which point the subcontractor will have a chance to submit a second opportunity invoice. You will receive a notification whenever a tax invoice is submitted by a subcontractor unless you have disabled them in Notification Preferences.
To review a tax invoice:
Open the Payment Schedules grid. Payment schedules with unreviewed tax invoices have the invoice status “Invoice – To Be Reviewed”.
Right-click the payment schedule with the invoice you wish to review, or left-click the schedule and click the menu icon
, then click Review Tax Invoice. This opens the payment schedule window where a new banner will have appeared.Click the Review Attachment link in the banner to download and view the tax invoice.
Once you have reviewed the invoice:
If you agree with the invoice, click
. The invoice status will update to “Tax Invoice is Verified” and the certificate will be created in ERP+.If you disagree with any part of the invoice, click
. You must enter a reason for the dispute in the popup window. Your comments will be visible to the subcontractor when they open the payment schedule to attach a second opportunity invoice.Once you have entered the reason, click
. The invoice status will change to “In Dispute” and the subcontractor will be notified. No certificate will be created.
Second Opportunity Tax Invoices
If you have marked a tax invoice as In Dispute, the subcontractor has the chance to submit a second opportunity tax invoice to solve the dispute. When the subcontractor submits a second opportunity tax invoice, you will receive a notification (unless you have disabled such notifications) and be able to review the new invoice. The process for reviewing a second opportunity tax invoice is the same as it was for the original invoice outlined above. The original invoice will still be visible in the Attachments tab for audit purposes; both the original and the second opportunity invoice will be clearly labelled in the Attachments tab.
Release Payment
If a payment schedule has no tax invoice attached, or if it has an attached invoice which has been marked as In Dispute, it is still possible to release it for payment regardless.
To release a payment schedule for payment:
Open the Payment Schedules grid. Payment schedules which can be released in this way will have invoice status “Awaiting Invoice” or “In Dispute”.
Right-click the payment schedule you wish to release for payment, or left-click the schedule and click the menu icon
, then click View.Open the Attachments tab. At the top of the screen will be the Release Payment button.
Click Release Payment. This opens the Release Payment popup window.
You must enter the Tax Invoice Number and Tax Invoice Date, as well as a reason for the release. The Tax Invoice Date cannot be before the valuation date or after the present day.
When you have completed the three fields, click
. If successful, you will receive a notification that the payment schedule has been released for payment.
Exporting Data
Every data grid within the Main Contractor section (All SC Orders, My SC Orders, Applications, Notices, Approval Workbench) can be exported as a .csv file. If you have the MC Reporting user role, you will also have access to the Reports section at the bottom of the vertical menu, containing three additional data grids (All SC Orders, All Applications, All Notices) which contain additional financial data and can also be exported.
To export a data grid:
Click the three vertical dots
in the top-right of the grid.Select Export from the drop-down menu. This begins the download of the .csv file.
Once the download is complete, the file will appear at the bottom of your browser.
Click the file to open it.
Notifications
Certain events that occur within the SC Controller application can be reported to you in the form of notifications. These notifications can be delivered within the web app, via individual emails or in a daily digest email. You can toggle which events you would like to receive notifications for, and how you would like to receive those notifications, in Notification Preferences.
Click your username or avatar, then click the Notifications icon
. This opens a list of the most recent notifications you have received across all POP Apps you have access to.Click the cog icon
at the top-right of the Notifications list. This opens the Notification Preferences window.Click Core to open the drop-down menu and select SC Controller to view the SC Controller-related notifications. If you are assigned to any additional user roles e.g. Workflow Manager, use the right-hand drop-down menu to switch between notifications specific to each role.
Tick/untick a box to enable/disable notifications for the event on that row via the method in that column. Any changes you make are instantly saved. Some notifications may be designated 'always on' or 'always off' at tenant level - these are indicated by a padlock with a tick or cross respectively. You cannot toggle such notifications. See below for an explanation of each notification.
Enter the time at which you would like to receive the daily digest email.
Role: MC QS
Notification | Description | Who can receive this notification |
New SC Order raised from ERP+ | If ticked, you will be notified when a new SC order relevant to you is committed in ERP+. |
|
Order has been cancelled | If ticked, you will be notified when an SC order relevant to you is cancelled in ERP+. |
|
Order has been uncommitted | If ticked, you will be notified when an SC order relevant to you is uncommitted in ERP+. |
|
Order has been delegated | If ticked, you will be notified when an SC order is delegated to or from you. |
|
Order has been shared with SC QS | If ticked, you will be notified after an SC order relevant to you is shared with a subcontractor, to confirm it went through. |
|
Subcontractor is not onboarded yet | If ticked, you will be notified when an SC order relevant to you is raised from ERP+ without the subcontractor having been onboarded yet. |
|
Contract Default Person Assigned | If ticked, you will be notified when you are added or removed as the default assignee for a contract. |
|
Application has been submitted | If ticked, you will be notified when a subcontractor submits an application for payment against an order relevant to you. |
|
Payment Notice is due | If ticked, you will be notified each day, beginning three days from the due date, about the impending payment notice due date, for each period of each order relevant to you. If there is no application, the notification is not sent. |
|
Pay Less Notice is due | If ticked, you will be notified each day, beginning three days from the due date, about the impending pay less notice due date, for each period of each order relevant to you. If there is no application or if a payment notice exists, the notification is not sent. |
|
Last date to send a Pay Less Notice is due | If ticked, you will be notified on the day of the last date to submit a pay less notice for each period of each order relevant to you. |
|
ERP+ Transmit Pay Notice actions | If ticked, you will be notified when a payment notice or pay less notice relevant to you is processed in COINS ERP+ or rejected by COINS ERP+. |
|
Pay has been rejected | If ticked, you will be notified when a payment notice or pay less notice relevant to you is rejected during notice approval. |
|
Approval Request Status has been changed | If ticked, you will be notified when a notice relevant to you is approved or rejected in workflow. |
|
Approval Request has been created | If ticked, you will be notified after a notice relevant to you is submitted for approval, to confirm it went through to your workflow manager. |
|
Approval Request Awaiting Status | If ticked, you will be notified when a new payment notice or pay less notice relevant to you for approval. |
|
Approval Workflow: Notice has been rejected | If ticked, you will be notified when a notice relevant to you is rejected in workflow. |
|
Notice Issued Subject to Approval | If ticked, you will be notified when a notice relevant to you has been auto-issued without being approved. The notification will contain the deadline for approval. The frequency of these notifications is configured in Company Order Rules. |
|
Notice Issued - Subject to Approval has been Rejected | If ticked, you will be notified when a notice relevant to you which was auto-issued without being approved has been rejected. |
|
Payment Notice Due Date - Notice is not submitted | If ticked, you will be notified at 8.00 am the day before the payment notice due date, in the case that the subcontractor has submitted an application and a payment notice has been created for it but has not yet submitted to workflow. |
|
Payment Notice Due Date - Notice does not exist | If ticked, you will be notified at 8.00 am the day before the payment notice due date, in the case that the subcontractor has submitted an application and no corresponding payment notice has been created or issued. |
|
Approval Rights Delegation | If ticked, you will be notified when a user delegates their approval responsibilities to you, or when you delegate to another user. |
|
Valuation Date has been modified | If ticked, you will be notified when the valuation dates are modified for an SC order relevant to you. |
|
Order has been re-opened | If ticked, you will be notified when a closed SC order relevant to you is reopened in ERP+. |
|
SC Liability Creation | If ticked, you will be notified when a new liability is created for you to review. This happens when a subcontractor submits an application for an order to which you are assigned, and the linked contract has the auto liability parameter enabled in ERP+. |
|
Notice Returned from ERP+ | If ticked, you will be notified when a notice relevant to you is returned from ERP+. |
|
Role: Workflow Manager
Pay limit has been exceeded | If ticked, you will be notified when a payment notice or pay less notice exceeding the pay limit is submitted for your approval. |
For all other notifications, see the MC QS table above.
Role: MC Senior QS
SQS Approval Request Awaiting Status | If ticked, you will be notified when a new payment notice or pay less notice is submitted for your approval as an SQS. |
For all other notifications, see the MC QS table above.