On selecting Add (
) from the Replan Plots tab, you are prompted for the following:
Field | Description |
Plot to Replan | The plot to replan. |
Replan Action | This is a dropdown with the following options:
|
Selecting Next (
) presents you with two tabs:
Replan Action
Detail
Replan Action
From this tab you can update the replan action for the selected plot.
When updating a plot’s replan details, the fields available differ according to the Replan Action.
Field | Description |
Amend House Type or Retire Plot |
|
New House Type (Amend House Type only) | The new house type code for the plot. |
Delete Valuation Ticks | Whether to delete any existing valuation ticks. This will delete all valuation amounts in all valuation periods for the plot. |
Transfer Costs (Retire Plot only) | Whether to transfer any plot costs to another plot. |
Cost Section (Retire Plot only) | The cost section to which the costs are to be transferred. This would probably be a non- sellable plot cost section but could be any cost section. |
Delete VAP Plot Stores | Whether any existing VAP plot stored values should be deleted.
|
VAP Budgets to Delete (Retire Plot only) VAP Budgets to Update from House Type (Amend House Type only) | The VAP budget types that are to be deleted or updated.
|
Sales Forecasts to Delete | The sales forecast types that are to be deleted.
|
Construction Forecasts to Delete | The construction forecast types that are to be revised.
|
Part Exchange/Second Charge Forecasts to Delete | The second charge/PX forecast types that are to be revised.
|
Clear BoQ Item Basket (Amend House Type only) | Whether any items in the item basket for the plot should be deleted. (This option is only shown if the BQ module is licensed.) |
BoQ Variants (Amend House Type only) | The variants that are applicable to the plot. This lets you select the variants from the associated house type. (This option is only shown if the BoQ module is licensed.) |
Any locked forecast or budget types will be available for selection. The replan process unlocks/locks the budget or forecast automatically. If you select a locked budget or forecast type a warning will be given.
|
|
Renumber |
|
New Plot Number | The new plot number.
|
Delete Plot |
|
Transfer Costs | Whether to transfer any plot costs to another plot. |
Cost Section | The cost section to which the costs are to be transferred. This would probably be a non- sellable plot cost section but could be any cost section. |
If you select the multi-add option from the Replan Plots browse, Coins ERP+ prompts you to enter a list of plot numbers (and where required house types), rather than a single plot. When this record is saved, COINS creates a replan record for each plot. The renumber action is not available with the multi-add option.
Detail
From the Detail tab you can see details of the current status of the plot across various Coins ERP+ modules. This is designed to help you assess the impact of replanning the plot.
Replan Preview/Processing
The Preview Replan and Process Replan options are essentially the same report, the difference being the process option will then update the required records in Coins ERP+.
They are separate functions on the options menu to allow users to control who can access the process option using standard function security.
Preview Replan
On selection, Coins ERP+ prompts for the following:
Field | Description |
Financial Period | If you have selected to transfer costs or renumber plots, you will be prompted for the financial period in which the journal batch should be created. |
Quick Check | Only perform the initial validation of the replan actions. The first stage of processing the replan is to perform the following checks:
|
Report
The first section of the report lists the plots that are going to be changed as part of the replan.
The remaining report output contains separate sections for each functional area of Coins ERP+ that will be or has been amended. Each section starts on a new page. The sections show details of:
the potential/actual BQ bill item changes
the potential/actual BQ material orders that require a variation
the potential/actual BQ subcontracts orders that require a variation
the potential/actual material orders that require a variation
the potential/actual subcontract orders that require a variation
the potential/actual tick sheet valuation changes
the potential/actual VAP budget changes
the potential/actual VAP matrix order changes
the potential/actual VAP specification changes
the potential/actual VAP cost head changes
the potential/actual VAP rebate changes
the potential/actual VAP plot store changes
the potential/actual sales workbench events to be deleted
the potential/actual sales/construction forecasts to be deleted
the potential/actual second charge/part-exchange forecasts to be deleted
the section, WBS and cost codes to be deleted
the potential/actual material requisitions that require amendment
the potential/actual subcontract requisitions that require amendment
If you have set up Document Manager to store documents against the development or replan table then a copy of the report will be stored against each. This only happens when running in ‘Process’ mode.
Process Replan
Once each plot is processed the status of the replan plot is set to ‘Complete’. Once all plots have been processed the replan status is set to ‘Complete’.
Process Replan: Amend House Type
When you amend the house type on a plot:
The following details on the plot are copied from the house type:
Floor Area
Gross Area
Construction Program
Dwelling Type
Notional Area
SAP
Carbon Index
Plot Description
House Type Code
For each plot replanned, a note is automatically added to the plot record using the standard Coins ERP+ note functionality.
For existing BQ bill item records:
The variants for the plot are updated.
The plot bill items are rebuilt from the new house type record, taking into account the selected plot variants.
If the same resource exists in the old and new house type then the bill item record is amended (not deleted/added) to ensure that the item is flagged as requiring a variation if the quantity has changed.
If the item is no longer applicable but has been ordered then the quantity is reduced to zero:
Unless the item has been delivered (GRN for a material order line) in which case the quantity is reduced to the delivered quantity;
Matrix certificate has been raised (Subcontract Orders) in which case the amount is reduced to the certified amount.
If you have selected the ‘Clear BoQ Item Basket’ then any items in the item basket are removed.
If any uncommitted orders exist, a warning is given.
For existing BQ orders (material or subcontract), if processing the bill items (as above) amended the quantity/price, the item is flagged as requiring a variation. You then need to create the variation using Standard BQ ordering functionality.
For existing purchase orders (material or subcontract) that are not linked to BQ:
A variation order is created and flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used. The buyer will then need to manually review the order.
A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.
For existing VAP Tick Sheet valuation records:
If you have not selected to delete the valuation ticks, then the valuation amount is adjusted to keep the percentage valuation figure the same in relation to the old and new budget figures.
If you have selected to delete the valuation ticks then any existing valuation amounts are deleted. Note that all valuations will be deleted for all valuation periods for the plot.
For existing VAP budget records:
For the selected budget types, the plot budget values are rebuilt from the development house type budget. This follows the same logic as the ‘Rebuild Entire Plot from House Type Budget’ selection within the ‘Plot VAP Rebuild’ option in Development Maintenance. If this changes the valuation budget then the valuation amount is adjusted to ensure the percentage valuation is retained (unless you have selected to delete the valuation ticks).
For existing VAP matrix order records:
Existing matrix order values are set to 0, unless a payment certificate exists in which case the order value is not amended.
For matrix orders created in BQ, you would create a variation order from BQ for items requiring variation
If the matrix element of an order is changed, this results in a discrepancy with the current order value, so Coins ERP+ creates an uncommitted variation order. The new parameter RPBUYER determines the buyer code for this variation; if this is blank then the existing buyer code for the order is used. Notes are added to detail the changes, using the standard Coins ERP+ note functionality. A flag and filter have been added to the Procurement Order browse to show replan variations.
Existing VAP plot specifications are updated to reflect the specifications from the new house type.
VAP Plot cost heads are updated to reflect the cost heads from the new house type. Any cost head that already exists that is not set up in the new house type is deleted, unless any of the following still exist for the cost head:
Valuation Ticks
Matrix Orders
VAP Budgets
BQ Bill items
If you have selected to ‘Delete VAP Plot Stores’ then the stores are deleted.
For the construction forecast, any existing details for the selected construction forecast types are cleared out.
Process Replan: Renumber Plot
When you renumber a plot:
The plot number on the plot details is changed to the new plot number.
For each plot replanned, a note is automatically added to the plot record, using the standard Coins ERP+ note functionality.
All BQ bill items and related order lines are moved to the new plot number.
A text line is added to the order to detail the plots that have been renumbered, this is done under an uncommitted variation order. The variation order is flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used.
If any uncommitted BQ orders exist, a warning is given.
For purchase orders (material or subcontract) that are not linked to BQ , for incomplete order lines, the WBS code and costing are moved to the new plot number.
A text line is added to the order to detail the plots that have been renumbered, this is done under an uncommitted variation order. The variation order is flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used.
A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.
A flag and filter have been added to the Procurement Order browse to show replan variations.
All Tick Sheet valuation records are moved to the new plot number.
All VAP budget records are moved to the new plot number.
All VAP matrix order records are moved to the new plot number.
Plot specifications are assigned the new plot number.
Plot cost heads are assigned the new plot number.
All VAP rebate records are moved to the new plot number.
All VAP plot store records are moved to the new plot number.
The plot number on all associated sales records on the Sales Workbench is amended.
All associated sales and construction forecast records are assigned the new plot number.
All associated second charge and part exchange forecast records are assigned the new plot number.
All associated Customer Care records are assigned the new plot number.
Plot costs in Contract Status:
A new section and WBS code are created for the new plot number.
The associated old section and old WBS record for the plot are deleted, but only if no costs have been posted to a cost code linked to the old section.
The costs associated with the plot are moved from the old section code to the new section code. A journal batch is created to move the costs out of the old section to the new section.
Only the balance is transferred across, i.e. one transaction per cost code.
The description for the journal line details the replan action. For example, Replan - Plot 001 Renumbered to Plot 999.
You are prompted for the financial period when they run the replan process.
The journal type for the cost transactions is specified using the new VAP parameter RPJNL .
Any cost codes on the old section with no transactions associated with them are deleted.
For open requisitions (material and subcontract), the WBS code and costing are moved to the new plot number.
Any other records that are linked to the plot are amended to the new plot number.
Process Replan: Add Plot
When a plot is added as part of the replan:
Plot details are set up, and for each plot added, a note is automatically added to the plot record, using the standard Coins ERP+ note functionality.
The BQ house type variants for the plot are created.
The development house type bill items are copied down to the plot, taking into account the selected plot variants.
For the selected VAP budget types the plot budget values are rebuilt from the development house type budget.
VAP Plot specifications are copied from the associated house type.
VAP Plot cost heads are copied from the associated house type.
For each development rebate, the default rebate value is added to the plot.
Process Replan: Retire Plot
Plots cannot be retired if:
The plot has been reserved, exchanged or completed in House Sales.
Any open pre-release reservations exist.
Any open cancellations exist.
When a plot is retired:
The plot is set to non-sellable.
The house type is set to the designated retired house type specified in the new VAP parameter RPRHTYPE.
The sales classification code is set to the designated code specified in the new VAP parameter RPRSCLS.
The floor area, gross area, garden area, frontage and notional area are set to 0.
The ground rent and service charge are both set to 0.
The procurement phase for the plot is set to the designated code specified in the VAP parameter RPPROCPH.
If the procurement phase is not set up on the development it is automatically created with a description of ‘Retired Plots’.
A note is automatically added to the plot record, using the standard Coins ERP+ note functionality.
All unordered BQ bill items are deleted.
Any items in the BQ item basket are removed.
For existing BQ orders:
For material order bill items, the quantity of the bill item is reduced to the delivered quantity (based on any GRNs).
For subcontract orders, the quantity of the bill item is reduced to 0 if no matrix certificates exist for the order, or to the certified value if a matrix certificate exists.
The item is then flagged as requiring a variation.
You would then use Standard BQ ordering functionality to create the variation.
If any uncommitted orders exist, a warning is given.
For existing material purchase orders that are not linked to BQ:
The quantity of the order line is reduced to 0 if no GRN exists and WBS codes have been entered at order line level.
If WBS codes have been entered at order line level and a GRN exists then the quantity of the order line is reduced to the delivered quantity.
These changes are made by generating an uncommitted variation order.
A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.
For existing subcontract purchase orders that are not linked to BQ:
An uncommitted variation order is created and flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used. The buyer will then need to manually review the order.
A note which details the plots replanned is added against each variation order created, using the standard Coins ERP+ note functionality.
If you have selected to delete existing VAP Tick Sheet valuation records, they are deleted. Note that in this case all valuations will be deleted for all valuation periods for the plot. If a matrix certificate has been raised, the valuation tick is marked as ‘Exempt’ so a negative accrual is not produced.
VAP Budget records for the selected budget types are deleted.
If you have not selected to delete the valuation records then for the valuation budget type, if a valuation exists for the payment stage then the budget is not deleted.
For existing VAP matrix order records, the matrix order amounts are reduced to the certified amount. If there is no matrix certificate then the order record is deleted.
This is not done for matrix orders created in BQ. You would create a variation order from BQ for items requiring variation.
If the matrix element of an order is changed, this results in a discrepancy with the current order value, so Coins ERP+ creates an uncommitted variation order. The new parameter RPBUYER determines the buyer code for this variation; if this is blank then the existing buyer code for the order is used. Notes are added to detail the changes, using the standard Coins ERP+ note functionality. A flag and filter have been added to the Procurement Order browse to show replan variations.
If the new parameter RPSPEC (see section 2) is set, then any existing VAP plot specifications are deleted and a new specification created as designated by the RPSPEC parameter.
VAP plot Cost heads are deleted, unless any of the following still exist for the cost head:
Valuation Ticks
Matrix Orders
VAP Budgets
BQ bill items
Any unprocessed VAP rebates are deleted.
If you have selected to ‘Delete VAP Plot Stores’ then the stores are deleted.
Because the plot is set to non-sellable it will no longer appear on the Sales Workbench or on Sales Reports.
For the selected forecast types the sales forecast records are deleted.
For the selected forecast types the second charge and part exchange forecast records are deleted.
If you have selected to journal out plot costs to another section then a journal batch is created to move the costs across to the selected section.
Only the balance is transferred across; that is, one transaction per cost code.
The description for the journal line details the replan action; for example, Replan- Plot 001 Retired - Transfer to Plot 999.
You are prompted for the financial period when they run the replan process.
The journal type for the cost transactions is specified using the new VAP parameter RPJNL (see section 2).
The GL batch is left unposted.
Any cost codes with no transactions associated with them are deleted.
Any associated items from open requisitions are removed.
Process Replan: Delete Plot
Plots cannot be deleted if:
One or more items have been ordered for the plot using BQ (including plot-specific and bulk material orders and subcontract orders).
If any uncommitted orders exist, a warning is given.
VAP matrix certificates exist.
The new VAP parameter RPDVAL is not set to Y and valuation ticks have been entered.
This check is based on the latest valuation amount, that is, it must be zero. It is not based on just the presence of a valuation record. This allows users to clear down the valuation first.
Any invoiced VAP rebate agreement exists.
The plot has been released, reserved, exchanged or legally completed in House Sales.
Any pre-release reservations exist.
Any cancellations exist.
Any cash or House Sales journals exist.
There are any Customer Care calls logged against the plot.
The plot has an offer or tenancy record in Lettings.
When a plot is deleted:
All the associated BQ bill items are deleted.
Any items in the BQ item basket are removed.
For existing material purchase orders not linked to BQ
The quantity of the order line is reduced to 0 if no GRN exists and WBS codes have been entered at order line level.
If WBS codes have been entered at order line level and a GRN exists then the quantity of the order line is reduced to the delivered quantity.
These changes are made by generating an uncommitted variation order.
A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.
For existing subcontract purchase orders not linked to BQ
An uncommitted variation order is created and flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code is used. The buyer will then need to manually review the order.
A note which details the plots replanned is added to each variation order created, using the standard Coins ERP+ note functionality.
All the associated VAP Tick Sheet valuation records are deleted. Note that all valuations will be deleted for all valuation periods for the plot.
All the associated VAP budget records are deleted.
All the associated VAP matrix order records are deleted.
This is not done for matrix orders created in BQ. (Note that a plot cannot be deleted if one or more items have been ordered in BQ).
Note the delete action cannot be selected if a matrix certificate exists.
If the matrix element of an order is changed, this results in a discrepancy with the current order value, so Coins ERP+ creates an uncommitted variation order. The new parameter RPBUYER determines the buyer code for this variation; if this is blank then the existing buyer code for the order is used. Notes are added to detail the changes, using the standard Coins ERP+ note functionality. A flag and filter have been added to the Procurement Order browse to show replan variations.
All associated VAP plot specifications are deleted.
All associated VAP plot cost heads are deleted.
Any unprocessed VAP rebates are deleted.
Any VAP plot stores are deleted.
Any remaining Sales Workbench sales records (history, etc.) are deleted.
Any construction and sales forecast records are deleted.
Existing second charge and part exchange forecast records are deleted.
For plot costs in Contract Status:
The associated section and WBS record for the plot are deleted, but only if no costs have been posted to a cost code linked to the section.
If you have selected to journal out the costs to another section (plot) then a journal batch is created to move the costs across to the selected section.
Only the balance is transferred across; that is, one transaction per cost code.
The description for the journal line details the replan action; for example, Replan - Plot 001 Deleted - Transfer to Plot 999.
You are prompted for the financial period when you run the replan process.
The journal type for the cost transactions is specified using the new VAP parameter RPJNL (see section 2)
The GL batch is left unposted.
Any cost codes with no transactions associated with them are deleted.
Any associated items from open requisitions (material or subcontract) are removed.
Any other records associated with the plot are deleted.
Retired Plots
In a number of areas of Coins ERP+, retired plots will not normally need to be shown. In these areas an option to exclude retired plots is available.
Exclude Retired Plots - Tick Box
The following screens have a tick box ‘Exclude Retired Plots’; this is ticked by default.
VAP Development Budget
VAP Valuation Matrix
VAP Development Matrix Report
VAP Development Budget Report
Construction Workbench – Gantt Chart Report
Exclude Retired Plots - Processing
Retired plots are always excluded from the following processes:
VAP Create Certificates from Valuation.
When creating the payment stages and plots for a new VAP matrix order.
VAP Payment Ticksheet Input
Construction Workbench – Construction Progress Tick Sheet Report
Construction Workbench – Progress Tick Sheet tab
Exclude Retired Plots - Filter
A named filter ‘Exclude Retired’ on the following screens allows retired plots to be excluded.
Construction Workbench – Plots tab
Construction Workbench – Forecast Matrix tab
Construction Workbench – Progress Update tab
Customer Care Workbench – Plot Browse
Transfer Section (Plot) Costs
An option is available from a dropdown Options menu on General Ledger Journal Input to allow a section (plot) costs to be transferred from one section to another.
On selecting this option, you are presented with the following screen:
From here you can select the source contract and section, and the contract and section to which the costs should be transferred. There is an option to select a target section in a different Coins ERP+ company; by default the target company defaults to the current logged-in company.
On selecting Next (
), for each cost code associated with the source section the following transactions are created in the journal batch:
For the source cost code a balancing transaction which reduces the costs to date to zero for the cost code.
For the target cost code a transaction for the costs to date is created.
Close Cost Codes
In Contract Maintenance, the Options Menu allows cost codes that already exist on a contract but are no longer valid (based on the valid list of cost head classes) to be closed. The process runs as a report due to the potential volume of cost code records that need to be updated. The report processes each open cost code on the contract and checks that it is still valid based on the current cost head class list. If the cost code is no longer valid, it is closed.
On selecting the new ‘Close Cost Codes’ option, you are presented with the standard report options tab.
Procurement Material/Subcontract Orders
A named filter option allows quick filtering of new replan variation orders.
Once the variation for an order flagged as a replan is committed, the replan flag is removed. This is ensures the filter only shows orders that require attention.