Skip to main content

Development Maintenance

Development Maintenance allows Users to set up and maintain details of a development and the plots on that development.

Written by Sunil Pandya

Before you can set up a Development with the House Sales Module it needs to be created in both the Central Repository (Project Workbench) and Contract Status Ledger. Both of these actions are normally carried out by the Finance Department who will inform you of the Contract / Development Number.


Creating a Development

Click Add ().

Enter the Contract code.

📌Note: A development is linked to a contract. If the contract record does not exist, you cannot add a development. If you have permission to create contracts, an Add Contract button allows you to add the contract first.

Details Tab

The Development Maintenance - Details tab allows you to maintain key details relating to the development, such as the name, areas, number of plots and sales classification.

Open

Field

Description

Contract

The contract (and phase, if appropriate).

Development Name

The name of the development. Even though the contract has a contract name, the development name can be different if required.

Land Name

The original name of the land before it was purchased by the house builder.

Gross Area

The gross area of the development

Net Area

The net area of the development.

Area Unit of Measure

The unit of measure for the area of this development.

Number of Plots

The number of plots in this development. This can be system generated or manually entered based on parameter settings

Number of HA Plots

The number of Housing Association units on the development. This can be system generated or manually entered based on parameter settings

Classification

The development classification code.

Development classifications are set up using House Sales > Plot Sales > Setup > Development Classification.

Sales Status

The sales status of the development (that is, whether the development is inactive, active or complete).

Development Status

The development status code.

Use Replan Workbench

Select this option so the adding of plots, deleting of plots and changes to a plot's house type must be done through the VAP > Development Maintenance > Replan Workbench

Sales Tab

The Development Maintenance - Sales tab allows you to maintain the sales information for the site. Most of this information is for printing on the availability list.

Open

Field

Description

Postcode

The postcode of the sales office.

Address

The address of the sales office.

Telephone

The sales office telephone number.

OS Easting

Geographical Easting Number Maximum Length: 6 characters

Latitude

The geographical latitude of the development.

OS Northing

Geographical Northing Number Maximum Length: 6 characters

Longitude

The geographical longitude of the development.

Fax

The sales office fax number.

Sales Manager

The sales manager for this site.

Telephone

The sales manager telephone number.

Sales Representative

The sales rep for this site.

Telephone

The sales rep’s telephone number.

Site Agent

The site agent for this site.

Telephone

The site agent telephone number.

Email Address

The email address of the sales office.

Development URL

Development URL.

Production Email Address

An additional contact email address for the development that can be used on workflows.

Housing Association Contact Email

A contact email address for the housing association associated with the development.

Sales Office Open

The sales office opening hours.

Development Opens

The date development opens.

First Price Release

The date of first price releases for this site.

Price Range

Price Range

Provisional Reservation

Are provisional reservations allowed (Y or N)? This setting is the default for new plots.

Provisional Reservation Deposit

If provisional reservations are allowed, what is the reservation deposit? This setting is the default for new plots.

Sales Schemes Not Allowed

Enter a can-do list of the sales schemes that cannot be used on this development.

Conveyancer

The conveyancer's code.

Availability Form

The availability list form to use on this development.

Availability Document

Availability Document

Default Solicitor

The default solicitor company name.

Office

The default solicitor company office name.

Contact

The name of the contact at the solicitor company.

Management Company

The management company name.

Office

The management company office name.

Contact

The name of the contact at the management company.

Year End

The year end for the management company on this development; this is used for pro-rating management charges.

Information Tab

The Development Maintenance - Information tab lets you maintain information about the development. This is shown on the Sales Information screen for the development.

Open

Field

Description

Sales Summary

The sales summary for this development.

Other Information

Any additional sales information for this development

Directions

Instructions on how to get to this development.


Adding Plots to a Development

Using Quick Add

  1. Click the link for the appropriate development.

  2. Go to the Plots tab.

    Open

  3. Set the Add Type to Quick Add.

  4. Click Add (Add Button).

    Open

Field

Description

Plot

The Plot Number

House Type

House Types allow you to record information about the house types you build, and the specifications that belong to each house type. The specifications in turn determine which cost heads are used on plots of that house type.

Sellable

Whether this plot is a sellable plot. Non-sellable plots are hidden from the House Sales module and excluded from the number of plots (if this is calculated automatically). Examples of non-sellable plots would be roads and sewers, or the structure of a block of flats

Sales Class

The sales classification, for example 'Housing Association', 'Private', and so on.

Build Sequence

The plots build sequence. A number that is either the actual build sequence, or a sorting sequence for reports and on-screen displays. The build sequences on different plots do not need to be unique. For example, on a development of flats, you could give all the flats in one block one sequence number, and all the flats in another block a different sequence.

Handling

The handing of the plot (whether the plot is As Drawing or Opposite Drawing).

Click Save (Save Icon).

Using Standard Add

  1. Set the Add Type to Standard Add.

  2. Click Add (Add Button).

    Open

Field

Description

Plot

The plot number. Maximum Length: 4 characters

House Type

The house type.

Unlabelled field

The name of the house type.

Sellable

Whether this plot is a sellable plot.

Sales Class

The sales classification, for example 'Housing Association', 'Private', and so on.

Build Sequence

The plot build sequence.

Address

The address of the plot.

Postcode

The postcode for the plot.

Garage/Parking

The type of garage this plot has.

Construction Method

The construction type.

Programme

The code for the construction programme.

Handing

The handing of the plot (whether the plot is As Drawing or Opposite Drawing).

Guarantee Scheme

This contains details of the warranty scheme given with the plot, for example details of the NHBC scheme.

Certificate Number

The certificate number for the guarantee scheme.

Date Registered

The date on which the guarantee scheme was registered.

Scheme Start Date

The start date for the guarantee scheme.

Expires

The date the guarantee scheme expires.

Our Warranty Expires

The warranty expiry date.

Sales Schemes Not Allowed

Enter a can-do list of the sales schemes that cannot be used on this plot. Note for a scheme to be valid for a plot it must not be disallowed at either development or plot level.

Management Company

Details of the management company.

Office

Details of the management company office.

Contact

Details of the contact at the management company.

Gross Area

The measurement for the whole plot.

Garden Area

The measurement of the garden.

Floor Area

The measurement of the Floor Area in the house or flat.

Frontage

The width of the house or flat.

Notional Area

The notional area of the plot. This can be used in the VAP budget apportionment calculation.

Show Home

Is this plot a show home?

Show On Release List

Indicates whether this plot should be included in the release list. Note the plot still has to be released for it to be shown.

Pre-release Reservations

Select if prerelease reservations are allowed on this plot.

Reservation Deposit

The default reservation deposit amount for prerelease reservations.

Budget Price

The budget price for the plot.

Original Appraisal Price

The original appraisal price given for this plot.

Minimum Price

The minimum price for which this plot can be sold.

Floor Level

If the plot is a flat, the floor level that it's on.

Staircase

The staircase reference associated with this property.

Expected Build

The date on which the construction is expected to finish.

Tenure

Whether Leasehold or Freehold.

Lease Expires

If the tenure is leasehold, when does it expire?

Ground Rent

The annual ground rent charge.

Service Charge

The annual service/maintenance charge.

Council Tax Band

The council tax band and annual council tax charge for the property.

Unlabelled field

The estimated annual council tax charge.

SAP

SAP rating: This is one of the government's recommended methods for the energy rating of dwellings. It is a value of 0 to 120 and is based on the annual energy costs for space and water heating.

Carbon Index

Carbon Index: This is one of the government's recommended methods for the energy rating of dwellings. It is a value on a scale of 0.0 to 10.0 and is based on the annual CO2 emissions associated with space and water heating.

Click Save (Save Icon).


Development Replanning Workbench

The Replan Workbench automates much of the task of replanning a housing development.

Users can renumber or change the house type of existing plots, delete or retire plots, and add new plots.

Associated records (such as orders, budgets, forecasts or rebates) are adjusted accordingly.

Initial Setup

The following VAP parameters affect the replan functionality:

Parameter

Description

RPDVAL

Within the Replan Workbench, are users allowed to delete a plot if a valuation exists (that is, if the current valuation for the plot is not zero)?

RPVPBUD

When retiring a plot or amending its house type through the Replan Workbench, these are the VAP budget types that are selected by default for update.

RPHSFC

When retiring a plot or amending its house type through the Replan Workbench, these are the sales forecast types that are selected by default for update.

RPRHTYPE

When retiring a plot through the Replan Workbench, this is the house type code that is assigned to the retired plot.

RPRSCLS

When retiring a plot through the Replan Workbench, this is the sales classification code that is assigned to on the retired plot.

RPJNL

For financial journals created using the Replan Workbench, this is the journal transaction type that is used for the transaction.

RPDMUSER

A can-do list of users/groups who are allowed access to deselect the 'Use Replan Workbench' option in Development Maintenance.

RPPROCPH

When retiring a plot through the Replan Workbench, this is the procurement phase that is assigned to the retired plot.

RPDEFPS

When retiring a plot or amending its house type through the Replan Workbench, these are the VAP plot report stores that are selected by default for deletion.

RPPSTORE

A can-do list of the VAP plot stores that a user can select to be deleted when retiring a plot or amending its house type through the Replan Workbench.

RPDELUSR

A can-do list of users/groups who are allowed access to the 'Delete Plot' replan action in the Replan Workbench.

RPBUYER

For variation orders created using the Replan Workbench, this is the buyer code that is used for the variation order. If this is left blank then the buyer from the previous version of the order will be used.

RPSPEC

When retiring a plot through the Replan Workbench, this is the specification code that is assigned to the retired plot.

Standard Replan Checklist Items

This maintenance function allows you to set up the standard list of checklist items for a replan at Coins ERP+ company (kco) level.

Open

From here you can maintain the checklist items. You can also control the sequence in which the items are shown, using the standard Coins ERP+ sequencing functionality.

📌Note: Since this will be copied to each replan, if the standard list is changed existing replans will not be affected.

Each item can be made mandatory – that is, it must be completed before the replan can be processed.

Replan Workbench set up – Development Maintenance

VAP > Development Maintenance > Development Maintenance

With the Development Details Screen a tickbox Use Replan Workbench, if ticked, prevents users from amending house types and adding or deleting plots using Development Maintenance. Instead this should be done through the Replan Workbench.

📌Note: Once this has been ticked, only users specified in the VAP parameter RPDMUSER can untick this box.

Open

Replan Workbench

VAP > Development Maintenance > Replan Workbench

To assist with the replanning of a development, a new replan workbench is available. This allows you to set up a new replan, enter details of the replan and then process the plots in the replan.

The Replan Workbench consists of two tabs:

  • Replans in Progress

  • Development Browse

Replans in Progress

The Replans in Progress tab allows you to start a new replan or select an existing replan that is in progress.

Open

The browse shows details of any replan that is currently in progress and has not been completed. It shows the following fields:

Field

Description

Development

The development number of the development to which the replan relates.

Name

The name of the development.

Replan

The unique number which identifies the replan within the selected development. Replans are numbered sequentially within each development. This field links to the main replan summary screen.

Description

Description of the replan, for example 'Planning change plots 050 to 060'.

Created By

The user who created the replan.

Date Created

The date the replan was created.

You can sort and filter by Development Number or Development Name.

Add New Replan

From the Replans in Progress screen, you can start a new replan. Click Add () and complete the following fields:

Open

Field

Description

Development

The development number of the development to which the replan relates.

Description

A description of the replan.

Notes

Any notes or comments that relate to the replan.

📌Note: Only one replan is allowed to be in progress at any one time on a development. However, replans for any number of different developments can be in progress at any one time.

On saving the replan the following fields are updated automatically:

Field

Description

Replan Number

This is generated sequentially from the previous replan for the development.

Date/Time Created

Created By

Status

This is set to ‘In Progress’.

Delete Replan

From here you can also use Delete (), to delete a replan.

Developments Tab

The Developments tab allows you to see a summary of the most recent replan for each development.

Open

The browse shows the following fields:

Field

Description

Development

The development number of the development to which the replan relates.

Name

The name of the development.

Last Replan

The unique number which identifies the most recent replan for the selected development. A link on this field takes you to the main replan summary screen

Status

The status of the replan (In Progress/Complete).

Description

Description of the replan, for example 'Planning change plots 050 to 060'.

Created By

The user who created the replan.

Date Created

The date the replan was created.

Date Completed

The date the replan was completed.

You can sort and filter by Development Number or Development Name.


Development Replans

The Development Replans screen shows a list of all the replans for a selected development.

Open

The browse shows the following fields:

Field

Description

Replan

The unique number which identifies the replan within the selected development. A link on this field takes you to the main replan summary screen

Status

The status of the replan (In Progress/Complete).

Description

Description of the replan, for example 'Planning change plots 050 to 060'.

Created By

The user who created the replan.

Date Created

The date the replan was created.

Completed By

The user who processed and completed the replan.

Date Completed

The date the replan was completed.

Replan Workbench - Summary

The replan summary screen allows you to see an overview of the replan and to set up details of the plots that are to be replanned. You are presented with the following tabs:

  • Summary

  • Replan Plots – this is not shown if the replan is complete.

  • New Plots – this is not shown if the replan is complete.

  • Plots Replanned – this is only shown if the replan is complete.

  • Checklist

A dropdown ‘Options’ menu contains the following options:

  • Preview Replan - This allows you to report on the potential changes that will happen when the replan is run.

  • Process Replan - This processes the replan and amends all the necessary records in COINS.

Summary Tab

The summary tab shows an overview of the status of the replan.

Open

The summary shows the following information:

Field

Description

Replan Status

The status of the replan (In Progress/Processing/Complete).

Plots Added

A list of the new plots to be added as part of this replan.

Plots with House Types Amended

A list of the plots on which the house type is to be amended as part of this replan.

Plots Deleted

A list of the plots to be deleted as part of this replan.

Plots Retired

A list of the plots to be retired as part of this replan.

Plots Renumbered

A list of the plots to be renumbered as part of this replan (showing the original numbers, not the new numbers).

Latest CVR

Details of the latest CVR for the Development.

VAP Budgets Locked

A list of the VAP budget types that are currently locked.

Sales Forecasts Locked

A list of sales forecast types that are currently locked.

Construction Forecasts Locked

A list of construction forecast types that are currently locked.

Second Charge/PX Forecasts Locked

A list of second charge/part exchange forecast types that are currently locked.

Notes

Any notes and comments relating to this replan. From here you can also update the notes for the replan by selecting Open ().

Replan Plots Tab

The Replan Plots tab shows the current set of plots that are required to be replanned. From here you can update the replan details for a plot. If the replan is complete then this tab will not be shown.

Open

The browse shows the following fields:

Field

Description

Plot

The original plot number.

House Type

The original house type. This is at the point the plot replan record was created.

Name

The original house type name.

Action

Is this plot to be renumbered, deleted, retired, or the house type amended? Note that plots cannot be added on this tab: this is done on the New Plots tab.

Revised Plot

The new plot number for plots which are being renumbered.

Revised House Type

The new house type code for plots where the house type is being amended.

Name

The new house type name for plots where the house type is being amended.

From here you can add or update the replan details for the plot. You can also delete the replan details. A multi-add option allows multiple plots to be added to the replan in one go. This allows plots to be selected by plot number range or house type.

📌Note: This browse only shows existing plots which are being replanned (having been added to the replan using the add button).

Existing plots on the development which are unaffected by the replan and new plots being added by the replan will not be shown.

New Plots Tab

The new plots tab allows you to set up new plots that are required to be added as part of the replan. If the replan is complete then this tab is not shown.

Open

This shows the following fields:

Field

Description

Plot

The plot number.

Seq

The plot build sequence.

House Type

The house type.

Name

The name of the house type.

Sellable?

Whether this plot is a sellable plot.

Sales Class

The type of sale (for example, Private or Social Housing).

From here you can maintain the list of new plots to be added to the development. When adding a plot, COINS prompts for the same details as when adding a plot using Development Maintenance.

Open

COINS also prompts you for the VAP budgets to copy from the development house type to the plot and the BoQ variants to be assigned to the new plot.

Open

Checklist Tab

The checklist tab allows you to see the list of predefined items that must be completed before a replan can take place. The items appearing in the checklist are user defined.

Open

When a new replan is created the standard checklist items are copied to this replan-specific checklist. From here you can update the following:

Field

Description

Status

A dropdown with the following options:

  • To Do

  • In Progress

  • Complete

  • N/A

Actioned By

The user who actioned the checklist item.

Notes

Free text notes and comments for the item.

When the item is set to Complete or N/A, Coins ERP+ records the user ID of the user updating the item and the date and time. Concurrent and multi updates are available on this screen.

📌Note: The checklist is intended to include actions which need to be completed manually either in Coins ERP+ or separately such as reviewing information or obtaining management authorisation.

Plots Replanned

The Plots Replanned tab allows you to see the detail of a completed replan.

📌Note: This tab is only shown if the replan is complete. It combines the information which for replans in progress is shown on the Replan Plots and New Plots tabs.

The browse shows the following columns:

Field

Description

Plot Number

The original plot number.

House Type

The code of the original house type.

Name

The original house type name.

Action

The replan action for the plot.

Revised Plot

The new plot number, if it has changed.

Revised House Type Code

The new house type for the plot, if it has changed.

Revised House Type Name

The new house type name for the plot, if the house type has changed.


Update Plot Replan Details

On selecting Add () from the Replan Plots tab, you are prompted for the following:

Open

Field

Description

Plot to Replan

The plot to replan.

Replan Action

This is a dropdown with the following options:

  • Amend House Type - This allows the house type for a plot to be amended.

  • Delete Plot - This will physically delete the plot record and its associated information from COINS.

  • Access to the Delete option is restricted to specific users/groups. This is controlled by the new parameter RPDELUSR.

  • Plots cannot be deleted if certain records have been recorded in COINS for the plot.

  • Renumber - This allows the plot number to be amended.

  • Retire Plot - This will set the plot as non-sellable, change the house type to a designated non-sellable plot and set the sales class to a designated sales class.

    • Plots cannot be retired if certain records have been recorded in COINS for the plot.

Selecting Next () presents you with two tabs:

  • Replan Action

  • Detail

Replan Action

From this tab you can update the replan action for the selected plot.

Open

When updating a plot’s replan details, the fields available differ according to the Replan Action.

Field

Description

Amend House Type or Retire Plot

New House Type

(Amend House Type only)

The new house type code for the plot.

Delete Valuation Ticks

Whether to delete any existing valuation ticks. This will delete all valuation amounts in all valuation periods for the plot.

Transfer Costs

(Retire Plot only)

Whether to transfer any plot costs to another plot.

Cost Section

(Retire Plot only)

The cost section to which the costs are to be transferred. This would probably be a non- sellable plot cost section but could be any cost section.

Delete VAP Plot Stores

Whether any existing VAP plot stored values should be deleted.

  • This option is only shown if users have configured at least one VAP plot store.

  • The list of plot stores from which you can select for deletion is determined by the new VAP parameter RPPSTORE.

  • By default the list of stores selected to delete is determined by the new parameter RPDEFPS.

VAP Budgets to Delete (Retire Plot only)

VAP Budgets to Update from House Type

(Amend House Type only)

The VAP budget types that are to be deleted or updated.

  • The selected types default to the budget types defined in the new VAP parameter RPVPBUD

Sales Forecasts to Delete

The sales forecast types that are to be deleted.

  • The selected types default to the forecast types defined in the new VAP parameter RPHSFC.

Construction Forecasts to Delete

The construction forecast types that are to be revised.

  • The selected types default to the forecast types defined in the new VAP parameter RPHSFC.

Part Exchange/Second Charge Forecasts to Delete

The second charge/PX forecast types that are to be revised.

  • The selected types should default to the forecast types defined in the new VAP parameter RPHSFC.

Clear BoQ Item Basket (Amend House Type only)

Whether any items in the item basket for the plot should be deleted. (This option is only shown if the BQ module is licensed.)

BoQ Variants

(Amend House Type only)

The variants that are applicable to the plot. This lets you select the variants from the associated house type. (This option is only shown if the BoQ module is licensed.)

Any locked forecast or budget types will be available for selection. The replan process unlocks/locks the budget or forecast automatically. If you select a locked budget or forecast type a warning will be given.

Renumber

New Plot Number

The new plot number.

  • Validation to check duplication of new plot numbers cannot be fully applied at the point of input, so it will be applied when the report or process for the replan is run.

Delete Plot

Transfer Costs

Whether to transfer any plot costs to another plot.

Cost Section

The cost section to which the costs are to be transferred. This would probably be a non- sellable plot cost section but could be any cost section.

If you select the multi-add option from the Replan Plots browse, Coins ERP+ prompts you to enter a list of plot numbers (and where required house types), rather than a single plot. When this record is saved, COINS creates a replan record for each plot. The renumber action is not available with the multi-add option.

Detail

From the Detail tab you can see details of the current status of the plot across various Coins ERP+ modules. This is designed to help you assess the impact of replanning the plot.

Open

Replan Preview/Processing

The Preview Replan and Process Replan options are essentially the same report, the difference being the process option will then update the required records in Coins ERP+.

They are separate functions on the options menu to allow users to control who can access the process option using standard function security.

Open

Preview Replan

On selection, Coins ERP+ prompts for the following:

Open

Field

Description

Financial Period

If you have selected to transfer costs or renumber plots, you will be prompted for the financial period in which the journal batch should be created.

Quick Check

Only perform the initial validation of the replan actions.

The first stage of processing the replan is to perform the following checks:

  • Check all mandatory check list items have been completed. If any have not then the replan cannot be processed.

  • Recheck that the plot replan actions are still valid as data could have been changed in Coins ERP+ since the plot replan record was created.

  • Check that the new plot numbers for renumbered and new plots do not conflict with each other and result in a duplicate plot number.

  • If the ‘Quick Check’ box is ticked, then only these checks are done, the rest of the checks/processing are not done.

Report

The first section of the report lists the plots that are going to be changed as part of the replan.

Open

The remaining report output contains separate sections for each functional area of Coins ERP+ that will be or has been amended. Each section starts on a new page. The sections show details of:

  • the potential/actual BQ bill item changes

  • the potential/actual BQ material orders that require a variation

  • the potential/actual BQ subcontracts orders that require a variation

  • the potential/actual material orders that require a variation

  • the potential/actual subcontract orders that require a variation

  • the potential/actual tick sheet valuation changes

  • the potential/actual VAP budget changes

  • the potential/actual VAP matrix order changes

  • the potential/actual VAP specification changes

  • the potential/actual VAP cost head changes

  • the potential/actual VAP rebate changes

  • the potential/actual VAP plot store changes

  • the potential/actual sales workbench events to be deleted

  • the potential/actual sales/construction forecasts to be deleted

  • the potential/actual second charge/part-exchange forecasts to be deleted

  • the section, WBS and cost codes to be deleted

  • the potential/actual material requisitions that require amendment

  • the potential/actual subcontract requisitions that require amendment

If you have set up Document Manager to store documents against the development or replan table then a copy of the report will be stored against each. This only happens when running in ‘Process’ mode.

Process Replan

Once each plot is processed the status of the replan plot is set to ‘Complete’. Once all plots have been processed the replan status is set to ‘Complete’.

Process Replan: Amend House Type

When you amend the house type on a plot:

  • The following details on the plot are copied from the house type:

    • Floor Area

    • Gross Area

    • Construction Program

    • Dwelling Type

    • Notional Area

    • SAP

    • Carbon Index

    • Plot Description

    • House Type Code

  • For each plot replanned, a note is automatically added to the plot record using the standard Coins ERP+ note functionality.

  • For existing BQ bill item records:

    • The variants for the plot are updated.

    • The plot bill items are rebuilt from the new house type record, taking into account the selected plot variants.

    • If the same resource exists in the old and new house type then the bill item record is amended (not deleted/added) to ensure that the item is flagged as requiring a variation if the quantity has changed.

    • If the item is no longer applicable but has been ordered then the quantity is reduced to zero:

      • Unless the item has been delivered (GRN for a material order line) in which case the quantity is reduced to the delivered quantity;

      • Matrix certificate has been raised (Subcontract Orders) in which case the amount is reduced to the certified amount.

    • If you have selected the ‘Clear BoQ Item Basket’ then any items in the item basket are removed.

    • If any uncommitted orders exist, a warning is given.

  • For existing BQ orders (material or subcontract), if processing the bill items (as above) amended the quantity/price, the item is flagged as requiring a variation. You then need to create the variation using Standard BQ ordering functionality.

  • For existing purchase orders (material or subcontract) that are not linked to BQ:

    • A variation order is created and flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used. The buyer will then need to manually review the order.

    • A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.

  • For existing VAP Tick Sheet valuation records:

    • If you have not selected to delete the valuation ticks, then the valuation amount is adjusted to keep the percentage valuation figure the same in relation to the old and new budget figures.

    • If you have selected to delete the valuation ticks then any existing valuation amounts are deleted. Note that all valuations will be deleted for all valuation periods for the plot.

  • For existing VAP budget records:

    • For the selected budget types, the plot budget values are rebuilt from the development house type budget. This follows the same logic as the ‘Rebuild Entire Plot from House Type Budget’ selection within the ‘Plot VAP Rebuild’ option in Development Maintenance. If this changes the valuation budget then the valuation amount is adjusted to ensure the percentage valuation is retained (unless you have selected to delete the valuation ticks).

  • For existing VAP matrix order records:

    • Existing matrix order values are set to 0, unless a payment certificate exists in which case the order value is not amended.

    • For matrix orders created in BQ, you would create a variation order from BQ for items requiring variation

    • If the matrix element of an order is changed, this results in a discrepancy with the current order value, so Coins ERP+ creates an uncommitted variation order. The new parameter RPBUYER determines the buyer code for this variation; if this is blank then the existing buyer code for the order is used. Notes are added to detail the changes, using the standard Coins ERP+ note functionality. A flag and filter have been added to the Procurement Order browse to show replan variations.

  • Existing VAP plot specifications are updated to reflect the specifications from the new house type.

  • VAP Plot cost heads are updated to reflect the cost heads from the new house type. Any cost head that already exists that is not set up in the new house type is deleted, unless any of the following still exist for the cost head:

    • Valuation Ticks

    • Matrix Orders

    • VAP Budgets

    • BQ Bill items

  • If you have selected to ‘Delete VAP Plot Stores’ then the stores are deleted.

  • For the construction forecast, any existing details for the selected construction forecast types are cleared out.

Process Replan: Renumber Plot

When you renumber a plot:

  • The plot number on the plot details is changed to the new plot number.

    • For each plot replanned, a note is automatically added to the plot record, using the standard Coins ERP+ note functionality.

  • All BQ bill items and related order lines are moved to the new plot number.

    • A text line is added to the order to detail the plots that have been renumbered, this is done under an uncommitted variation order. The variation order is flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used.

    • If any uncommitted BQ orders exist, a warning is given.

  • For purchase orders (material or subcontract) that are not linked to BQ , for incomplete order lines, the WBS code and costing are moved to the new plot number.

    • A text line is added to the order to detail the plots that have been renumbered, this is done under an uncommitted variation order. The variation order is flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used.

    • A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.

    • A flag and filter have been added to the Procurement Order browse to show replan variations.

  • All Tick Sheet valuation records are moved to the new plot number.

  • All VAP budget records are moved to the new plot number.

  • All VAP matrix order records are moved to the new plot number.

  • Plot specifications are assigned the new plot number.

  • Plot cost heads are assigned the new plot number.

  • All VAP rebate records are moved to the new plot number.

  • All VAP plot store records are moved to the new plot number.

  • The plot number on all associated sales records on the Sales Workbench is amended.

  • All associated sales and construction forecast records are assigned the new plot number.

  • All associated second charge and part exchange forecast records are assigned the new plot number.

  • All associated Customer Care records are assigned the new plot number.

  • Plot costs in Contract Status:

    • A new section and WBS code are created for the new plot number.

    • The associated old section and old WBS record for the plot are deleted, but only if no costs have been posted to a cost code linked to the old section.

    • The costs associated with the plot are moved from the old section code to the new section code. A journal batch is created to move the costs out of the old section to the new section.

      • Only the balance is transferred across, i.e. one transaction per cost code.

      • The description for the journal line details the replan action. For example, Replan - Plot 001 Renumbered to Plot 999.

      • You are prompted for the financial period when they run the replan process.

      • The journal type for the cost transactions is specified using the new VAP parameter RPJNL .

    • Any cost codes on the old section with no transactions associated with them are deleted.

  • For open requisitions (material and subcontract), the WBS code and costing are moved to the new plot number.

  • Any other records that are linked to the plot are amended to the new plot number.

Process Replan: Add Plot

When a plot is added as part of the replan:

  • Plot details are set up, and for each plot added, a note is automatically added to the plot record, using the standard Coins ERP+ note functionality.

  • The BQ house type variants for the plot are created.

  • The development house type bill items are copied down to the plot, taking into account the selected plot variants.

  • For the selected VAP budget types the plot budget values are rebuilt from the development house type budget.

  • VAP Plot specifications are copied from the associated house type.

  • VAP Plot cost heads are copied from the associated house type.

  • For each development rebate, the default rebate value is added to the plot.

Process Replan: Retire Plot

Plots cannot be retired if:

  • The plot has been reserved, exchanged or completed in House Sales.

  • Any open pre-release reservations exist.

  • Any open cancellations exist.

When a plot is retired:

  • The plot is set to non-sellable.

  • The house type is set to the designated retired house type specified in the new VAP parameter RPRHTYPE.

  • The sales classification code is set to the designated code specified in the new VAP parameter RPRSCLS.

  • The floor area, gross area, garden area, frontage and notional area are set to 0.

  • The ground rent and service charge are both set to 0.

  • The procurement phase for the plot is set to the designated code specified in the VAP parameter RPPROCPH.

    • If the procurement phase is not set up on the development it is automatically created with a description of ‘Retired Plots’.

  • A note is automatically added to the plot record, using the standard Coins ERP+ note functionality.

  • All unordered BQ bill items are deleted.

  • Any items in the BQ item basket are removed.

  • For existing BQ orders:

    • For material order bill items, the quantity of the bill item is reduced to the delivered quantity (based on any GRNs).

    • For subcontract orders, the quantity of the bill item is reduced to 0 if no matrix certificates exist for the order, or to the certified value if a matrix certificate exists.

    • The item is then flagged as requiring a variation.

    • You would then use Standard BQ ordering functionality to create the variation.

    • If any uncommitted orders exist, a warning is given.

  • For existing material purchase orders that are not linked to BQ:

    • The quantity of the order line is reduced to 0 if no GRN exists and WBS codes have been entered at order line level.

    • If WBS codes have been entered at order line level and a GRN exists then the quantity of the order line is reduced to the delivered quantity.

    • These changes are made by generating an uncommitted variation order.

    • A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.

  • For existing subcontract purchase orders that are not linked to BQ:

    • An uncommitted variation order is created and flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code for the order is used. The buyer will then need to manually review the order.

    • A note which details the plots replanned is added against each variation order created, using the standard Coins ERP+ note functionality.

  • If you have selected to delete existing VAP Tick Sheet valuation records, they are deleted. Note that in this case all valuations will be deleted for all valuation periods for the plot. If a matrix certificate has been raised, the valuation tick is marked as ‘Exempt’ so a negative accrual is not produced.

  • VAP Budget records for the selected budget types are deleted.

    • If you have not selected to delete the valuation records then for the valuation budget type, if a valuation exists for the payment stage then the budget is not deleted.

  • For existing VAP matrix order records, the matrix order amounts are reduced to the certified amount. If there is no matrix certificate then the order record is deleted.

    • This is not done for matrix orders created in BQ. You would create a variation order from BQ for items requiring variation.

    • If the matrix element of an order is changed, this results in a discrepancy with the current order value, so Coins ERP+ creates an uncommitted variation order. The new parameter RPBUYER determines the buyer code for this variation; if this is blank then the existing buyer code for the order is used. Notes are added to detail the changes, using the standard Coins ERP+ note functionality. A flag and filter have been added to the Procurement Order browse to show replan variations.

  • If the new parameter RPSPEC (see section 2) is set, then any existing VAP plot specifications are deleted and a new specification created as designated by the RPSPEC parameter.

  • VAP plot Cost heads are deleted, unless any of the following still exist for the cost head:

    • Valuation Ticks

    • Matrix Orders

    • VAP Budgets

    • BQ bill items

  • Any unprocessed VAP rebates are deleted.

  • If you have selected to ‘Delete VAP Plot Stores’ then the stores are deleted.

  • Because the plot is set to non-sellable it will no longer appear on the Sales Workbench or on Sales Reports.

  • For the selected forecast types the sales forecast records are deleted.

  • For the selected forecast types the second charge and part exchange forecast records are deleted.

  • If you have selected to journal out plot costs to another section then a journal batch is created to move the costs across to the selected section.

    • Only the balance is transferred across; that is, one transaction per cost code.

    • The description for the journal line details the replan action; for example, Replan- Plot 001 Retired - Transfer to Plot 999.

    • You are prompted for the financial period when they run the replan process.

    • The journal type for the cost transactions is specified using the new VAP parameter RPJNL

    • The GL batch is left unposted.

  • Any cost codes with no transactions associated with them are deleted.

  • Any associated items from open requisitions are removed.

Process Replan: Delete Plot

Plots cannot be deleted if:

  • One or more items have been ordered for the plot using BQ (including plot-specific and bulk material orders and subcontract orders).

    • If any uncommitted orders exist, a warning is given.

  • VAP matrix certificates exist.

  • The new VAP parameter RPDVAL is not set to Y and valuation ticks have been entered.

    • This check is based on the latest valuation amount, that is, it must be zero. It is not based on just the presence of a valuation record. This allows users to clear down the valuation first.

  • Any invoiced VAP rebate agreement exists.

  • The plot has been released, reserved, exchanged or legally completed in House Sales.

  • Any pre-release reservations exist.

  • Any cancellations exist.

  • Any cash or House Sales journals exist.

  • There are any Customer Care calls logged against the plot.

  • The plot has an offer or tenancy record in Lettings.

When a plot is deleted:

  • All the associated BQ bill items are deleted.

  • Any items in the BQ item basket are removed.

  • For existing material purchase orders not linked to BQ

    • The quantity of the order line is reduced to 0 if no GRN exists and WBS codes have been entered at order line level.

    • If WBS codes have been entered at order line level and a GRN exists then the quantity of the order line is reduced to the delivered quantity.

    • These changes are made by generating an uncommitted variation order.

    • A note which details the plots replanned is added to the variation order, using the standard Coins ERP+ note functionality.

  • For existing subcontract purchase orders not linked to BQ

    • An uncommitted variation order is created and flagged as a replan order. The new parameter RPBUYER determines the buyer code for the variation. If this is blank then the existing buyer code is used. The buyer will then need to manually review the order.

    • A note which details the plots replanned is added to each variation order created, using the standard Coins ERP+ note functionality.

  • All the associated VAP Tick Sheet valuation records are deleted. Note that all valuations will be deleted for all valuation periods for the plot.

  • All the associated VAP budget records are deleted.

  • All the associated VAP matrix order records are deleted.

    • This is not done for matrix orders created in BQ. (Note that a plot cannot be deleted if one or more items have been ordered in BQ).

    • Note the delete action cannot be selected if a matrix certificate exists.

    • If the matrix element of an order is changed, this results in a discrepancy with the current order value, so Coins ERP+ creates an uncommitted variation order. The new parameter RPBUYER determines the buyer code for this variation; if this is blank then the existing buyer code for the order is used. Notes are added to detail the changes, using the standard Coins ERP+ note functionality. A flag and filter have been added to the Procurement Order browse to show replan variations.

  • All associated VAP plot specifications are deleted.

  • All associated VAP plot cost heads are deleted.

  • Any unprocessed VAP rebates are deleted.

  • Any VAP plot stores are deleted.

  • Any remaining Sales Workbench sales records (history, etc.) are deleted.

  • Any construction and sales forecast records are deleted.

  • Existing second charge and part exchange forecast records are deleted.

  • For plot costs in Contract Status:

    • The associated section and WBS record for the plot are deleted, but only if no costs have been posted to a cost code linked to the section.

    • If you have selected to journal out the costs to another section (plot) then a journal batch is created to move the costs across to the selected section.

    • Only the balance is transferred across; that is, one transaction per cost code.

    • The description for the journal line details the replan action; for example, Replan - Plot 001 Deleted - Transfer to Plot 999.

    • You are prompted for the financial period when you run the replan process.

    • The journal type for the cost transactions is specified using the new VAP parameter RPJNL

    • The GL batch is left unposted.

    • Any cost codes with no transactions associated with them are deleted.

  • Any associated items from open requisitions (material or subcontract) are removed.

  • Any other records associated with the plot are deleted.


Retired Plots

In a number of areas of Coins ERP+, retired plots will not normally need to be shown. In these areas an option to exclude retired plots is available.

Exclude Retired Plots - Tick Box

The following screens have a tick box ‘Exclude Retired Plots’; this is ticked by default.

  • VAP Development Budget

  • VAP Valuation Matrix

  • VAP Development Matrix Report

  • VAP Development Budget Report

  • Construction Workbench – Gantt Chart Report

Exclude Retired Plots - Processing

Retired plots are always excluded from the following processes:

  • VAP Create Certificates from Valuation.

  • When creating the payment stages and plots for a new VAP matrix order.

  • VAP Payment Ticksheet Input

  • Construction Workbench – Construction Progress Tick Sheet Report

  • Construction Workbench – Progress Tick Sheet tab

Exclude Retired Plots - Filter

A named filter ‘Exclude Retired’ on the following screens allows retired plots to be excluded.

  • Construction Workbench – Plots tab

  • Construction Workbench – Forecast Matrix tab

  • Construction Workbench – Progress Update tab

  • Customer Care Workbench – Plot Browse


Transfer Section (Plot) Costs

An option is available from a dropdown Options menu on General Ledger Journal Input to allow a section (plot) costs to be transferred from one section to another.

Open

On selecting this option, you are presented with the following screen:

Open

From here you can select the source contract and section, and the contract and section to which the costs should be transferred. There is an option to select a target section in a different Coins ERP+ company; by default the target company defaults to the current logged-in company.

On selecting Next (), for each cost code associated with the source section the following transactions are created in the journal batch:

  • For the source cost code a balancing transaction which reduces the costs to date to zero for the cost code.

  • For the target cost code a transaction for the costs to date is created.


Close Cost Codes

In Contract Maintenance, the Options Menu allows cost codes that already exist on a contract but are no longer valid (based on the valid list of cost head classes) to be closed. The process runs as a report due to the potential volume of cost code records that need to be updated. The report processes each open cost code on the contract and checks that it is still valid based on the current cost head class list. If the cost code is no longer valid, it is closed.

Open

On selecting the new ‘Close Cost Codes’ option, you are presented with the standard report options tab.


Procurement Material/Subcontract Orders

A named filter option allows quick filtering of new replan variation orders.

Open

Once the variation for an order flagged as a replan is committed, the replan flag is removed. This is ensures the filter only shows orders that require attention.


Standard House Type Load

Standard House Type Load allows house types and their specifications to be loaded from a CSV file. The function also automatically generates the cost heads for a house type based on the associated specifications.

The columns for the load file are as follows.

  • House Type Code (vud_code)

  • Name (vud_name)

  • Market Mix (vud_cat)

  • Description (vud_htdesc)

  • Gross Area (vud_area)

  • Floor Area (vud_size)

  • Frontage (vud_width)

  • Depth (vud_depth)

  • Notional Area (vud_nareadec)

  • Dwelling Type (vud_dwelltype)

  • Construction Programme (hpt_prog)

  • Garage/Parking (vud_garage)

  • Construction Method (vud_ctype)

  • Density (vud_density)

  • Bedrooms (vud_beds)

  • Receptions (vud_recpts)

  • Bathrooms (vud_baths)

  • Parking (vud_parking)

  • EPC Energy Efficiency (vud_epceff)

  • EPC Potential Energy Efficiency (vud_epcpoteff)

  • EPC Environmental Efficiency (vud_epcenveff)

  • EPC Potential Environmental Efficiency (vud_epcpenveff)

  • SAP Rating (vud_sap)

  • Carbon Index ( vud_CI)

  • Locations (vud_locations)

  • Choices Range (vud_choicerange)

  • Default Payment Schedule (hpa_code)

  • Sale Price Breakdown 1 (vud_salepricebdwn__1)

  • Sale Price Breakdown 2 (vud_salepricebdwn__2)

  • Sale Price Breakdown 3 (vud_salepricebdwn__3)

  • Sale Price Breakdown 4 (vud_salepricebdwn__4)

  • Sale Price Breakdown 5 (vud_salepricebdwn__5)

  • Sale Price Breakdown 6 (vud_salepricebdwn__6)

  • Sale Price Breakdown 7 (vud_salepricebdwn__7)

  • Sale Price Breakdown 8 (vud_salepricebdwn__8)

  • Sale Price Breakdown 9 (vud_salepricebdwn__9)

  • Sale Price Breakdown 10 (vud_salepricebdwn__10)

  • Specifications

    This allows the user to enter a list of specifications.

    A house type specification record will be created for each specification listed here.

    Once the specifications have been created, the house type cost heads will be generated based on these specifications.

It’s assumed the load file will have a header row, so the first row of the file is ignored.

Due to the volume of processing that is required to generate the cost heads, this function works as a background report.

The body of the report shows the following columns:

  • House Type Code

  • Name

  • Status

    This shows ‘Loaded’ with a green background if the house type has been loaded successfully.

    If any errors are encountered, details of the errors are shown with a red background. Note: if an error occurs this does not prevent the remaining house types from being loaded.

    If any warnings are encountered, details of the warnings are shown with an orange background.

Development House Type Load

The same functionality for loading standard house types has also been provided to load development-specific house types.

This is available from the ‘Options’ menu on the Development House Type maintenance screen.


Plot Groups

The Development Maintenance - Plot Groups tab allows you to maintain the plot groups on this development. Plot groups allow you to group plots together for reporting purposes, for example, to group all the plots in a block of flats together.

Set up plot groups for the development, then indicate which group a plot belongs to using the Plot Group field when updating a plot.

Not all plots need to belong to a group; for example, if you are building houses and blocks of flats on the same development, the house plots might not belong to a group.

Plot Groups are Development specific.

Creating Plot Groups

HB CRM > Administration > Plot Administration > Development Maintenance

Bill of Quantities> Setup > Site Setup > Development Maintenance

Open

Creating Plot Groups

  1. Click the link for the development.

  2. Go to the Groups tab.

    Open

  3. Click Add (Add Button) and enter the Plot Groups.

    Open

Field

Description

Group:

The code for the construction stage.

Description:

A description of the construction stage.

Click Save (Save Icon). Continue to enter all Plot Groups.

The System will continue to open new lines for you to enter. Once you have finished adding Groups click Undo ().

Open

📌Note: If you set up a plot group with a blank code to represent generic plots, then groups for each Group of Apartments, Terraces etc; when you add a new plot, by default it will belong to the blank (generic) group, and you only need to change it if the plot is part of a block of apartments.

Assigning Plots to Plot Groups

Locations:

Customer Care > Development Maintenance

HB CRM > Administration > Plot Administration > Development Maintenance

VAP > Development Maintenance > Development Maintenance

  1. Click the link for the required development.

    Open

  2. Go to the Plots tab.

    Open

  3. Click Open () against a plot.

    Open

    📌Note: If you have set up a plot group with a blank code to represent house plots, then groups for each set of flats; then when you add a new plot, by default it will belong to the blank (generic) group, and you only need to change it if the plot belongs to an actual Plot Group.

Field

Description

Plot Group:

The plot group that this plot belongs to within the selected development. You can use plot groups, for example, to indicate which block a flat belongs to.

Once the Plot Group is selected, click Save (Save Icon).

Continue to update all plots.

Bulk Assigning Plots to a Group

Use the Multi Update function for two or more plots to save time.

  1. Select the Plots tab.

  2. Select Multiple Plots as below:

    Open

  3. Select Multi () .

    Open

  4. Enter the following information:

Field

Comments

Plot Group:

The plot group that this plot belongs to within the selected development. You can use plot groups, for example, to indicate which block a flat belongs to.

Once the plot group is selected, click Save (Save Icon).

All selected plots will be assigned to the specified group.

📌Note: You may be required to “untick” fields, the System will prompt you.


Plot Summary Details

HB CRM > Administration > Plot Administration > Development Maintenance

Bill of Quantities> Setup > Site Setup > Development Maintenance

Open

  1. Click the link for the required development.

    Open

  2. Go to the Plots tab.

    Open

  3. Click the link for the required plot.

  4. Go to the Details tab.

    Open

  5. Click Open ().

  6. Enter the following information:

Field

Content

Comments

Buttons

Garage/Parking:

Select

The type of garage/parking this plot has.

Construction Method:

Select

The construction type.

Programme:

Select

The code for the construction programme.

Handing:

Select

The handing of the plot (whether the plot is As Drawing or Opposite Drawing).

Click Save (Save Icon) when you have finished.

Click Next (Next Icon).

Continue to update all plots.

📌Note: The address can be updated by Sales or Construction staff.

Bulk Update Plot Summary Details

  1. Go to the Plots tab for a selected development.

  2. Select multiple plots as below.

    Open

Click Multi ().

Open

📌Note: The image above does not include all updatable fields.

Use the Multi Update function for two or more plots to save time.

Click Save (Save Icon) when you have made your changes.

All the selected plots will be updated with the new values.


Quick Add Plot Address

A development can have a number of plots. You need to add an address for each plot within a Development. If there are many plots this can be extremely time consuming as you will need to add the plot address individually for each plot. There is a quick add address option within Coins ERP+ which allows you to add an address for multiple plots.

HB CRM > Administration > Plot Administration > Development Maintenance

Bill of Quantities> Setup > Site Setup > Development Maintenance

Open

  1. Using the filter option type in the development code or name and click Filter

    ().

    📌Note: You will need to change the search option to Development Name to search for the development name.
    You will need to change the search option to Development to search for the development code.

  2. Once you have found the development click on the link to go into the development.

  3. Once you navigated into the development click on the Plots tab.

    You will now have a list of all the plots within the development.

  4. Using the tick option, add in a tick to all the plots you would like to add the address for.

    Open

    📌Note: To select multiple plots hold the Ctrl key and put a ticket on the plots you want to add the address in for
    If you want to select all the plots within the development click on the Show All () button. Holding down the Shift key on your keyboard mark a tick on the first plot. Scroll down to the last plot and tick the last plot. This will select all the plots in-between.

  5. Once you have selected the plots you want to add/change the address for, choose Quick Address Add from the action menu and click Apply Action () .

    Open
    Open

  6. Under the “Address Details” section type in the address and postcode which will be applied to all the selected plots.

  7. Under the “Plot House Number” section, type in the house number for each plot.

  8. Click Next (Next Icon) to apply the changes.

    All the plot addresses have now been changed. You can check by going into the development, clicking on the plot link and checking the plot address.

Did this answer your question?